Laserfiche WebLink
Recommended Conditions of Approval February 20, 2014 <br />PLN2013-00045; 1333 Martinez Street Page 19 of 20 <br />I. The storage of materials, installation of processes and/or equipment outdoors may place <br />the facility into the Industrial/Commercial Facility Stormwater program and require <br />submittal to the Regional Water Quality Control Board a Notice of Intent (NOI) to <br />comply with the State Wide General Industrial Facility Permit. The elimination of <br />exposure to stormwater by relocating indoors, covering or utilizing other engineered <br />controls is highly recommended. <br /> <br />J. The generation or discharge of wastewaters, other than domestic sewerage, may require a <br />pretreatment permit for discharge to the sanitary sewer. If a permit is required, submittal <br />of an application to the City’s Environmental Services is required prior to finaling of the <br />building permit or commencing the discharge; whichever shall occur first. <br /> <br />K. A Planned Development subject to installation of structural stormwater treatment BMPs <br />per section C3 of the Municipal Regional Permit shall complete a Stormwater Structural <br />Treatment BMP Operation & Maintenance Data Form. The form shall be submitted to the <br />City’s Engineering Division prior to finaling of the grading permit. <br /> <br />L. Changes to ownership, operator, maintenance contractor, Structural Treatment BMPs <br />installed, the O&M Plan, or any other information contained in the Data Form shall be <br />provided to the City by submittal of a revised O&M Data Form 30 days prior to the <br />effective date of the change. Revised Data Forms shall be submitted to the Environmental <br />Services Section. <br /> <br />XII. ALAMEDA COUNTY FIRE DEPARTMENT REQUIREMENTS <br /> <br />A. The project shall comply with the applicable Building and Fire Codes as adopted by the <br />City of San Leandro. Site, building and fire protection system plans shall be provided for <br />review and approval by the Fire Department. Required emergency vehicle access shall be <br />provided on the building permit plans to the satisfaction of the Fire Department. <br /> <br />B. Fire hydrants and fire flow are required for the project per the California Fire Code <br />Appendix B and C. Provide fire flow information for the site. The fire flow information is <br />available from EBMUD. <br /> <br />C. Each office building shall be provided with an automatic sprinkler system. The sprinkler <br />systems are required to be monitored by an approved supervising station. <br /> <br />D. A Knox box is required at the entry to each building. In the event driveway(s) are gated, a <br />Knox key switch is required at the gate in the driveway. <br /> <br />E. Prior to issuance of building permits, project plans shall show that all areas on-site that <br />are required to be marked “No Parking” and painted red, including any turnaround on the <br />site and any required fire lanes.