My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2014 0421
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0421
>
8B Consent 2014 0421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2014 3:58:18 PM
Creation date
4/17/2014 6:06:35 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/21/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0421 CSAmended+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0421
Ord 2014-002
(Reference)
Path:
\City Clerk\City Council\Ordinances\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> 5 <br /> <br /> <br />b. Construction of a landscaped paseo (walkway) with public access <br />easement (the “Walkway Improvements”) for safe passage from Alvarado St. to the BART <br />Station to the east, as generally described in Exhibit C attached hereto and incorporated herein by <br />this reference. The Walkway Improvements will entail the removal and replacement of the <br />existing pedestrian at-grade [train] crossing and replacing it with the paseo at a location, subject <br />to City approval, closer to the BART station fare gates. Developer will use good faith efforts to <br />obtain approvals and permits from the applicable agencies that are necessary to construct the <br />Walkway Improvements. It is understood that Developer has no control over the granting of <br />approvals necessary to complete any improvements in the railroad right-of- way bordering the <br />project site along Martinez Street . In the event Developer is not granted any required permits or <br />approvals related to complete the work contemplated by this subsection, the Project may proceed <br />to construction as approved in the Project Approvals and contemplated by this Agreement. <br />Completion of improvements within any railroad right-of-way shall not be a condition of <br />approval of the Project. <br />c. Construction of bicycle parking, including bicycle lockers and <br />shelters, as mutually agreed between City and Developer consistent with the amount of bicycle <br />parking needed for the Phase One Improvements. <br />d. Provided that there are no construction schedule conflicts with the <br />development of the proposed multi-phased development project by BRIDGE Housing <br />Corporation at 1400 San Leandro Boulevard (currently used as a BART parking lot) and that <br />there are no costs to be borne by Developer, Developer shall, if needed, make a good faith effort <br />to work with BRIDGE Housing Corporation to provide temporary parking for BART patrons on <br />the Developer’s site while BRIDGE’s development project is under construction. <br /> <br />1.4.4. Phase Two Improvements. Phase Two of the Project consists of the <br />construction of a minimum six story building with a minimum square footage of 120,000 square <br />feet that would consist of commercial office space, and in addition may include limited retail <br />space of 12,000 square feet or less (“Phase Two Improvements”). Phase Two Improvements <br />will include all of the following construction: <br />a. Construction of bundled parking up to a maximum ratio of 3.0 <br />parking spaces per 1,000 square feet of office or retail space. Developer shall have the right to <br />charge for all bundled parking in Phase Two. The parking may be constructed as above grade or <br />below grade structured parking as appropriate, to accommodate a sufficient number of parking <br />spaces and levels for both the Phase Two and the Phase Three Improvements. <br />b. Construction of bicycle parking, including bicycle lockers and <br />shelters, as mutually agreed between City and Developer consistent with the amount of bicycle <br />parking needed for the Phase Two Improvements. <br />c. Completion of improvements within any railroad right-of-way. <br />1.4.5. Phase Three Improvements. Phase Three of the Project consists of the <br />construction of a minimum five story building with a minimum square footage of 100,000 square <br />feet that would consist of commercial office space, and in addition may include limited retail
The URL can be used to link to this page
Your browser does not support the video tag.