My WebLink
|
Help
|
About
|
Sign Out
Home
4B Public Hearing 2014 0505
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0505
>
4B Public Hearing 2014 0505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 4:17:51 PM
Creation date
4/30/2014 9:35:40 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/5/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0505 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
PowerPoint 4B&4C Public Hearing 2014 0505 Fee and Tax Increases 2014-15
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
Reso 2014-036
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />Generators, including switchboard and controlling apparatus therefore and wiring between same and generator for each rated maximum of kW or kVA, and fraction thereof: <br />1 to 20 $22.10 Remove (consolidated below) <br />21 to 50 $57.10 Remove (consolidated below) <br />51 and above $87.00 Remove (consolidated below) <br />New Consolidated fee language <br />1 to 20 $22.10 New Consolidated fee <br />21 to 50 $57.10 New Consolidated fee <br />51 to 80 $87.00 New Consolidated fee <br />81 and above $100.00 New Consolidated fee <br />Rectifiers (mercury arc, vibrating and electrolytic) for each kW or kVA and fraction thereof:Remove (consolidated above) <br />1 to 20 $22.10 Remove (consolidated above) <br />21 to 50 $57.10 Remove (consolidated above) <br />51 to 80 $87.00 Remove (consolidated above) <br />81 and above $100.00 Remove (consolidated above) <br />For inspection of alterations and changes in existing wiring, each inspection <br />visit <br />$30.00 $30.70 CPI <br />Photovoltaic Fees do not include Issuing and Filing Fees, Automation fees, and other mandated fees <br />Photovoltaic - Residential $60.00 (includes over-the-counter plan <br />check, 1 inverter, 1 disconnect, and circuit <br />connection to main panel) <br />Photovoltaic - Commercial/Industrial 0 to 8kw $250.00 (includes 1hr. structural plan <br />check, 1 hr. electrical plan check, and 1 <br />inverter) <br />CPI <br />Photovoltaic - Commercial/Industrial >8 to 48kw $350.00 (includes 1-1/2hr. structural plan <br />check, 1 hr. electrical plan check, and 1 <br />inverter ) <br />CPI <br />Photovoltaic - Commercial/Industrial >48kw $700.00 (includes 4 hrs. structural plan <br />check, 1 hr. electrical plan check, and 1 <br />inverter) <br />CPI <br />Each 0 - 8kw P.V. Inverter over 1 $22.00 22.50$ CPI <br />Each >8 - 48kw P.V. Inverter over 1 $52.00 53.10$ CPI <br />Each >48kw P.V. Inverter over 1 $84.00 85.80$ CPI <br />Energy Conservation: review of plans and/or energy forms for all buildings <br />subject to the California Energy Commission’s conservation regulations (when <br />not covered by building permit) <br />Direct Cost (1) with a minimum charge of $62.00 <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />Transformers and balance coils, when not embodied in or included with apparatus for which fee is herein specifically <br />prescribed, Generators, and Rectifiers (mercury arc, vibrating and electrolytic) rated for each rated kVA and fraction <br />thereof: <br />$256.00 (includes 1hr. <br />structural plan check, 1 hr. <br />electrical plan check, and 1 <br />inverter) <br />$358.00 (includes 1-1/2hr. <br />structural plan check, 1 hr. <br />electrical plan check, and 1 <br />inverter ) <br />$715.00 (includes 4 hrs. <br />structural plan check, 1 hr. <br />electrical plan check, and 1 <br />inverter) <br /> 8
The URL can be used to link to this page
Your browser does not support the video tag.