Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />Generators, including switchboard and controlling apparatus therefore and wiring between same and generator for each rated maximum of kW or kVA, and fraction thereof: <br />1 to 20 $22.10 Remove (consolidated below) <br />21 to 50 $57.10 Remove (consolidated below) <br />51 and above $87.00 Remove (consolidated below) <br />New Consolidated fee language <br />1 to 20 $22.10 New Consolidated fee <br />21 to 50 $57.10 New Consolidated fee <br />51 to 80 $87.00 New Consolidated fee <br />81 and above $100.00 New Consolidated fee <br />Rectifiers (mercury arc, vibrating and electrolytic) for each kW or kVA and fraction thereof:Remove (consolidated above) <br />1 to 20 $22.10 Remove (consolidated above) <br />21 to 50 $57.10 Remove (consolidated above) <br />51 to 80 $87.00 Remove (consolidated above) <br />81 and above $100.00 Remove (consolidated above) <br />For inspection of alterations and changes in existing wiring, each inspection <br />visit <br />$30.00 $30.70 CPI <br />Photovoltaic Fees do not include Issuing and Filing Fees, Automation fees, and other mandated fees <br />Photovoltaic - Residential $60.00 (includes over-the-counter plan <br />check, 1 inverter, 1 disconnect, and circuit <br />connection to main panel) <br />Photovoltaic - Commercial/Industrial 0 to 8kw $250.00 (includes 1hr. structural plan <br />check, 1 hr. electrical plan check, and 1 <br />inverter) <br />CPI <br />Photovoltaic - Commercial/Industrial >8 to 48kw $350.00 (includes 1-1/2hr. structural plan <br />check, 1 hr. electrical plan check, and 1 <br />inverter ) <br />CPI <br />Photovoltaic - Commercial/Industrial >48kw $700.00 (includes 4 hrs. structural plan <br />check, 1 hr. electrical plan check, and 1 <br />inverter) <br />CPI <br />Each 0 - 8kw P.V. Inverter over 1 $22.00 22.50$ CPI <br />Each >8 - 48kw P.V. Inverter over 1 $52.00 53.10$ CPI <br />Each >48kw P.V. Inverter over 1 $84.00 85.80$ CPI <br />Energy Conservation: review of plans and/or energy forms for all buildings <br />subject to the California Energy Commission’s conservation regulations (when <br />not covered by building permit) <br />Direct Cost (1) with a minimum charge of $62.00 <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />Transformers and balance coils, when not embodied in or included with apparatus for which fee is herein specifically <br />prescribed, Generators, and Rectifiers (mercury arc, vibrating and electrolytic) rated for each rated kVA and fraction <br />thereof: <br />$256.00 (includes 1hr. <br />structural plan check, 1 hr. <br />electrical plan check, and 1 <br />inverter) <br />$358.00 (includes 1-1/2hr. <br />structural plan check, 1 hr. <br />electrical plan check, and 1 <br />inverter ) <br />$715.00 (includes 4 hrs. <br />structural plan check, 1 hr. <br />electrical plan check, and 1 <br />inverter) <br /> 8