My WebLink
|
Help
|
About
|
Sign Out
Home
4B Public Hearing 2014 0505
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0505
>
4B Public Hearing 2014 0505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 4:17:51 PM
Creation date
4/30/2014 9:35:40 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/5/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0505 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
PowerPoint 4B&4C Public Hearing 2014 0505 Fee and Tax Increases 2014-15
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
Reso 2014-036
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />4 Plumbing Permit <br />A. Filing and Issuance Fee $92.00 plus the amount shown below for <br />each plumbing item <br />CPI <br />B. Plan Check, when applicable Direct Cost (1) <br />Exemption: Inspection of the installation of an earthquake gas shutoff <br />valve <br />$30.00 With No Filing & Issuance Fee CPI <br />For new Residential Construction and additions with valuations over <br />$100,000 including all water piping, gas piping, water heating and plumbing <br />fixtures <br />16% of building permit fee <br />Plumbing fixture or waste discharge, each $11.50 $ 11.80 CPI <br />Plumbing fixture removed and opening sealed, each $6.60 $ 6.70 CPI <br />Plumbing fixture reset or set after the completion of the structure to an <br />outlet roughed in prior thereto, each <br />$8.60 $ 8.80 CPI <br />Repair or alteration of drainage or vent piping, each $13.20 $ 13.50 CPI <br />Inside rain leader, each $8.60 $ 8.80 CPI <br />Dishwasher – residential, each $8.60 $ 8.80 CPI <br />Dishwasher – commercial, each $12.70 $ 13.00 CPI <br />Garbage disposal – residential, each $8.60 $ 8.80 CPI <br />Garbage disposal – commercial, each $12.25 $ 12.50 CPI <br />Grease interceptor, each, up to 150 gal.$8.60 $ 8.80 CPI <br />Grease interceptor, each, over 150 gal.$20.60 21.10$ CPI <br />Industrial waste interceptor (sand, grease, oil/water separator, neutralizer <br />and clarifier) installation or removal, each <br />$27.10 $ 27.70 CPI <br />Sewage ejector pump – residential, each $18.30 $ 18.70 CPI <br />Sewage ejector pump – commercial, each $29.10 $ 29.70 CPI <br />Water Piping: <br />Water line and first 10 openings (including water using equipment <br />connected thereto) <br />$13.20 $ 13.50 CPI <br />Each additional opening $1.80 $ 1.85 CPI <br />Installation, replacement or abandonment of water service, each $13.20 $ 13.50 CPI <br />Irrigation sprinkler system and first 20 heads $27.10 $ 27.70 CPI <br />Each additional head $0.60 $ 0.60 CPI <br />Inspection of Irrigation Controllers installed in sprinkler systems $5.35 $ 5.50 CPI <br />Installation, alteration or repair of water piping and/or water treating <br />or using equipment, each <br />$13.20 $ 13.50 CPI <br />Submeters Inspection $10.70 $ 10.90 CPI <br />Water Heaters (gas or electric): <br />Under 90 gallons, each $38.80 $ 39.70 CPI <br />Over 90 gallons, each $77.45 $ 79.20 CPI <br />T & P valve, each N/C <br />Flues: <br />Minimum (one or two flues)$10.70 $ 10.90 CPI <br />Each flue over two (each)$6.60 $ 6.70 CPI <br />Vacuum Breakers or Back-flow Devices: <br />Four or less $10.70 $ 10.90 CPI <br />Each additional $2.95 $ 3.00 CPI <br />Swimming Pools: <br />Private, each $80.55 $ 82.30 CPI <br />Public, each $134.00 $ 136.90 CPI <br />In-ground spas, hot tubs and portable hot tubs $80.55 $ 82.30 CPI <br />Sewers and Storm Drains: <br />Storm drain or building sewer per 100 feet or fraction thereof $20.65 $ 21.10 CPI <br />Building court connection to main sewer lateral, each $30.30 $ 31.00 CPI <br />Building rainwater drain systems, complete, each $38.80 $ 39.70 CPI <br />Septic tank outfit complete ( installation or removal/abandonment), each $60.85 $ 62.20 CPI <br />Sewer extension, each $20.65 $ 21.10 CPI <br />Site sewer lateral between building and street main, new or repairs or <br />abandonment <br />$38.80 $ 39.70 CPI <br />Temporary privy or vault (chemical toilet), each $17.70 $ 18.10 CPI <br />Gray Water Systems (fee to cover review of plans and inspection of <br />the installed system) <br />$141.00 $ 144.10 CPI <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />$94.00 plus the amount <br />shown below for each <br />plumbing item <br />$30.65 With No Filing & <br />Issuance Fee <br /> 9
The URL can be used to link to this page
Your browser does not support the video tag.