My WebLink
|
Help
|
About
|
Sign Out
Home
4B Public Hearing 2014 0505
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0505
>
4B Public Hearing 2014 0505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 4:17:51 PM
Creation date
4/30/2014 9:35:40 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/5/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0505 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
PowerPoint 4B&4C Public Hearing 2014 0505 Fee and Tax Increases 2014-15
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
Reso 2014-036
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />5 Heating, Ventilating and Air Condition or General Mechanical (Continued) <br />Flues: <br />Minimum (one or two flues)$10.65 $ 10.90 CPI <br />Each flue over two (each)$6.60 $ 6.70 CPI <br />Ventilating System for Kitchen, Bath, etc.: <br />Minimum (one or two systems)$10.65 $ 10.90 CPI <br />Each system over two $9.10 $ 9.30 CPI <br />General Mechanical: <br />Incinerators – domestic, each $15.45 $ 15.80 CPI <br />Incinerators – commercial/industrial, each $60.60 $ 61.90 CPI <br />Garbage chutes, each $19.90 $ 20.30 CPI <br />Fire dampers, each $9.10 $ 9.30 CPI <br />Smog control after burners, commercial/industrial, each system $41.20 $ 42.10 CPI <br />Refrigeration system – commercial/industrial, each system $52.65 $ 53.80 CPI <br />Condensate drain system, each inlet $4.00 $ 4.10 CPI <br />Boilers: <br />All sizes $ 75.00 New consolidated fee <br />To 3 h.p. each $15.95 Remove (consolidated above) <br />Over 3 to 15 h.p. each $23.65 Remove (consolidated above) <br />Over 15 to 30 h.p., each $30.30 Remove (consolidated above) <br />Over 30 to 50 h.p., each $46.00 Remove (consolidated above) <br />Over 50 h.p., each $77.45 Remove (consolidated above) <br />Heat pumps, each $23.65 $ 24.20 CPI <br />Cooling Systems: <br />To 100,000 BTU each $20.85 $ 21.30 CPI <br />Over 100,000 to 500,000 BTU, each $32.90 $ 33.60 CPI <br />Over 500,000 to 1,000,000 BTU, each $43.45 $ 44.40 CPI <br />Over 1,000,000 BTU, each $53.95 $ 55.10 CPI <br />Evaporative Cooler, each $21.70 $ 22.20 CPI <br />Industrial Processing Equipment: <br />Ovens, dryers, cookers, fryers, kettles, etc. each $34.25 $ 35.00 CPI <br />Industrial processing exhaust systems, each system $34.25 $ 35.00 CPI <br />Manufactured spray booths, each $34.25 $ 35.00 CPI <br />Energy Conservation: review of plans and/or energy forms for all buildings <br />subject to the California Energy Commission’s conservation regulations (when <br />not covered by building permit) <br />Direct Cost (1) with a minimum charge of <br />$62.00 <br />CPIDirect Cost (1) with a <br />minimum charge of $63.35 <br /> 11
The URL can be used to link to this page
Your browser does not support the video tag.