Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />5 Heating, Ventilating and Air Condition or General Mechanical (Continued) <br />Flues: <br />Minimum (one or two flues)$10.65 $ 10.90 CPI <br />Each flue over two (each)$6.60 $ 6.70 CPI <br />Ventilating System for Kitchen, Bath, etc.: <br />Minimum (one or two systems)$10.65 $ 10.90 CPI <br />Each system over two $9.10 $ 9.30 CPI <br />General Mechanical: <br />Incinerators – domestic, each $15.45 $ 15.80 CPI <br />Incinerators – commercial/industrial, each $60.60 $ 61.90 CPI <br />Garbage chutes, each $19.90 $ 20.30 CPI <br />Fire dampers, each $9.10 $ 9.30 CPI <br />Smog control after burners, commercial/industrial, each system $41.20 $ 42.10 CPI <br />Refrigeration system – commercial/industrial, each system $52.65 $ 53.80 CPI <br />Condensate drain system, each inlet $4.00 $ 4.10 CPI <br />Boilers: <br />All sizes $ 75.00 New consolidated fee <br />To 3 h.p. each $15.95 Remove (consolidated above) <br />Over 3 to 15 h.p. each $23.65 Remove (consolidated above) <br />Over 15 to 30 h.p., each $30.30 Remove (consolidated above) <br />Over 30 to 50 h.p., each $46.00 Remove (consolidated above) <br />Over 50 h.p., each $77.45 Remove (consolidated above) <br />Heat pumps, each $23.65 $ 24.20 CPI <br />Cooling Systems: <br />To 100,000 BTU each $20.85 $ 21.30 CPI <br />Over 100,000 to 500,000 BTU, each $32.90 $ 33.60 CPI <br />Over 500,000 to 1,000,000 BTU, each $43.45 $ 44.40 CPI <br />Over 1,000,000 BTU, each $53.95 $ 55.10 CPI <br />Evaporative Cooler, each $21.70 $ 22.20 CPI <br />Industrial Processing Equipment: <br />Ovens, dryers, cookers, fryers, kettles, etc. each $34.25 $ 35.00 CPI <br />Industrial processing exhaust systems, each system $34.25 $ 35.00 CPI <br />Manufactured spray booths, each $34.25 $ 35.00 CPI <br />Energy Conservation: review of plans and/or energy forms for all buildings <br />subject to the California Energy Commission’s conservation regulations (when <br />not covered by building permit) <br />Direct Cost (1) with a minimum charge of <br />$62.00 <br />CPIDirect Cost (1) with a <br />minimum charge of $63.35 <br /> 11