My WebLink
|
Help
|
About
|
Sign Out
Home
4B Public Hearing 2014 0505
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0505
>
4B Public Hearing 2014 0505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 4:17:51 PM
Creation date
4/30/2014 9:35:40 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/5/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0505 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
PowerPoint 4B&4C Public Hearing 2014 0505 Fee and Tax Increases 2014-15
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
Reso 2014-036
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />7 Excavation and Grading <br />Minimum Fee $69.00 PLUS the fees shown in the fee <br />schedule as adopted by the City Council <br />except that wherever an hourly rate is <br />shown, the rate shall be equal to the <br />Direct Cost (1) or whichever is greater. <br />CPI <br />Plan Checking $69.00 PLUS the fees shown in the fee <br />schedule as adopted by the City Council <br />except that wherever an hourly rate is <br />shown, the rate shall be equal to the <br />Direct Cost (1) or whichever is greater. <br />CPI <br />8 Miscellaneous <br />A. Inspection Fees <br />Fees for inspection not otherwise set forth herein Direct Cost (1) <br />Courtesy Inspection for projects that are awaiting permit issuance <br />pending completion of plan review <br /> $250 for inspections during normal <br />business hours and $375 for inspections <br />outside normal business hours <br />Fees for inspection conducted outside of normal business hours Rate equal to 1.5 times the Direct Cost <br />(1) with a minimum fee of two (2) hours <br />B. Extra Inspection Fees <br />(1) Deficient or defective work, or otherwise through fault or error <br />on the part of the holder of permit or his/her employees <br />One inspection made under the regular <br />fees as provided herein <br />Each and every further extra inspection visit Direct Cost (1) with a minimum of one hour <br />(2) Incorrect Address or location of work Direct Cost (1) with a minimum of one-half hour <br />(3) Amending application to increase the number of devices <br />authorized for installation or repair after permit has been issued and <br />before any inspection of work is made: <br />Fees as stated herein for additional <br />installations <br />(4) Investigation fee for work commenced without first obtaining <br />permits as required by the San Leandro Municipal Code, whether or <br />not a permit is subsequently issued <br />Fee equal to three (3) times the <br />minimum fees PLUS any required permit <br />fee <br />(5) Code Compliance Inspections at the request of the property <br />owner. <br />Direct Cost (1) with a minimum of one <br />hour <br />(6) Investigation Fee for conditions that are not in compliance with <br />the San Leandro Zoning and/or Municipal Codes <br />Direct Cost(1) <br /> CPI <br />Note: Payment of any investigation fees does not exempt any person from compliance with all other provisions of <br />applicable codes in the execution of the work nor from any other penalties prescribed by law. <br />$71.00 PLUS the fees shown <br />in the fee schedule as <br />adopted by the City Council <br />except that wherever an <br />hourly rate is shown, the rate <br />shall be equal to the Direct <br />Cost (1) or whichever is <br />greater. <br />$71.00 PLUS the fees shown <br />in the fee schedule as <br />adopted by the City Council <br />except that wherever an <br />hourly rate is shown, the rate <br />shall be equal to the Direct <br />Cost (1) or whichever is <br />greater. <br /> $255 for inspections during <br />normal business hours and <br />$383 for inspections outside <br />normal business hours <br /> 13
The URL can be used to link to this page
Your browser does not support the video tag.