My WebLink
|
Help
|
About
|
Sign Out
Home
4B Public Hearing 2014 0505
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0505
>
4B Public Hearing 2014 0505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 4:17:51 PM
Creation date
4/30/2014 9:35:40 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/5/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0505 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
PowerPoint 4B&4C Public Hearing 2014 0505 Fee and Tax Increases 2014-15
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
Reso 2014-036
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />ENGINEERING AND TRANSPORTATION DEPARTMENT <br />1 General Encroachment SLMC 5-1-225 <br />A. Permit $65.00 <br />B.1 Inspection/Plan Review/Permit Issuance Direct Costs (1) <br />B.2 Permit + Inspection Fee $215 = $65 (Permit) + $150 (Inspection) <br />(For estimated Inspection Requirements = 1 <br />1/2 Hours as determined by City Engineer) <br />C. Trench Damage/Penalty Fee $1.50/square ft. of trench for streets under 2 yrs. old <br />$1.25/square ft. of trench for streets over 2 yrs. old <br />D. Inspection/Security/Plan Review Deposit As determined by City Engineer to insure <br />prompt, high quality repairs and to cover <br />estimated inspection costs and plan review <br />cost. <br />E. No Permit Penalty Fee Double Inspection Fee and Permit Fee <br />F. Sidewalk Inspection: <br />-- 100% Property Owner Work Cost of Work + 15% of Cost of Work performed by City Contractor <br />-- Neighborhood Improvement Program 15% of costs of work performed by City Contractor <br />-- Annual Sidewalk Repair Program No Cost <br />G. Agreement Direct Costs (1) <br />H. Overhead Banner Installation and Removal $150.00 <br />I. News rack Permit $55.00 + $5.50 per news rack <br /> Maintenance Deposit $100.00 + $5.00 per news rack <br />2 Subdivision: <br />A. Parcel Map Waiver/Lot Line Adjustment/ or Certificate of Compliance Direct Costs (1); $1,600 initial deposit <br />B. Parcel Map Direct Costs (1); $4,000 plus $100 per lot initial deposit <br />C. Tentative/Final Map Direct Costs (1) <br />D. Subdivision Improvement Plan Review Direct Costs (1) <br />3 Building Permits: <br />A. Plan Review Direct Costs (1); $55.00 minimum <br />B. Agreement Preparation Direct Costs (1) <br />4 Large Format Copies (see also Community Development Dept.)$10.00 for first sheet and $2.00 for each sheet thereafter plus Direct Costs (1) <br />5 Park Facilities Development Impact Fees (2)SLMC 7.13.100 <br /> Park Land Acquisition Fee: <br /> Single Family $12,849.48 12,986.84$ Used shelter component of <br /> Multi-Family $11,231.07 11,351.13$ CPI for SF Bay Area for land <br /> Special Unit $5,616.11 5,676.14$ fees <br /> Park Improvement Fee: <br /> Single Family $2,327.95 2,316.64$ Used Engineering News Record (ENR) <br /> Multi-Family $2,035.06 2,025.18$ Construction Cost Indices <br /> Special Unit $1,017.55 1,012.60$ to determine fees <br /> Total Acquisition and Improvement Fee: <br /> Single Family $15,177.43 15,303.48$ <br /> Multi-Family $13,266.14 13,376.31$ <br /> Special Unit $6,633.65 6,688.75$ <br />6 Grading Permits: <br />A. Permit $55.00 <br />B. Inspection Direct Costs (1) <br />C. Inspection Deposit As determined by City Engineer <br />D. Plan Review Direct Costs (1) <br />7 Public Works Projects: <br />A. City Standard Plans (Printed or CD)$10.00 <br />B. Bidder: City Projects Plans & Specification Documents purchased at City Hall Direct Costs (rounded to nearest $5) or a minimum of $25.00 <br />C. Bidder: City Project Plans & Specification Documents purchased via mail Direct Costs (rounded to nearest $5) or a minimum of $25.00 + mailing costs <br />8 Overhead Utility Conversion <br />A. Residential Development Lesser of:Underground Utility District Master Plan <br />i) Actual/estimated costs, or <br />ii) $1,333.46 per dwelling unit ii) $1,365.56 per <br />dwelling unit <br />Used ENR Construction Cost Index to determine fees <br />B. Non-Residential Development Actual/estimated cost; approximately <br />$333.67/LF <br />Actual/estimated <br />cost; approximately <br />$341.70/LF <br />9 City Property Use Application Fee Direct Costs (1) <br />(1) Direct Costs: Hourly personnel charge plus a factor of 33% for benefits, 54% for indirect overhead charges and 87% for staff support charges. <br />(2) Effective 8/5/05 the Park Development Fees will be amended in accordance with Resolution 2005-069 <br /> 18
The URL can be used to link to this page
Your browser does not support the video tag.