Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />From - To and Including <br />$1.00 - $4,000 $140.00 CPI <br />$4,001.00-$50,000.00 $140.00 for the first $4,000.00 plus $13.90 <br />for each additional $1,000 or fraction <br />thereof, to and including $50,000 <br /> CPI <br />$50,001.00-$100,000.00 $779.00 for the first $50,000 plus $9.75 for <br />each additional $1,000 or fraction thereof, <br />to and including $100,000.00 <br /> CPI <br />$100,001.00-$500,000.00 $1,266.00 for the first $100,000 plus $5.55 <br />for each additional $1,000 or fraction <br />thereof, to and including $500,000.00 <br /> CPI <br />$500,001.00-$1,000,000.00 $3,486.00 for the first $500,000 plus $5.25 <br />for each additional $1,000 or fraction <br />thereof, to and including $1,000,000.00 <br /> CPI <br />$1,000,001.00 and up $6,106.00 for the first $1,000,000 plus <br />$4.40 for each additional $1,000 or fraction <br />thereof, to and including $1,000,000.00 <br /> CPI <br />B. Termite Repair Work $90.00 plus total valuation as listed above CPI <br />$0.00 - $3,000 $140.00 CPI <br />Over $3,000 Same as for other building permits, <br />minimum of $140.00 <br /> CPI <br />C. Residential 1 and 2 Family Re-roof <br />Main dwelling roof New flat rate fee for main dwelling roof <br />Detached garages and accessory structures on same property as <br />main dwelling and done at the same time as the main dwelling roof. <br />New flat rate fee for accessory roofs <br />Total Valuation: (Based on total value of all construction work, as determined by the Building Official, including all finish work, roofing, <br />electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment.) <br />$143.00 for the first $4,000.00 <br />plus $14.20 for each additional <br />$1,000 or fraction thereof, to <br />and including $50,000 <br />$796.00 for the first $50,000 <br />plus $10.00 for each additional <br />$1,000 or fraction thereof, to <br />and including $100,000.00 <br />$1,294.00 for the first $100,000 <br />plus $5.70 for each additional <br />$1,000 or fraction thereof, to <br />and including $500,000.00 <br />$3,931.00 for the first $500,000 <br />plus $5.40 for each additional <br />$1,000 or fraction thereof, to <br />and including $1,000,000.00 <br />$6,240.00 for the first <br />$1,000,000 plus $4.50 for each <br />additional $1,000 or fraction <br />thereof, over $1,000,000 <br />$94.00 plus total valuation as <br />listed above <br />143.00$ <br />143.00$ <br />$235.00 all sizes and materials <br /> $ 75.00 <br />Same as for other building <br />permits, minimum of $143.00 <br /> 4