My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 2014-002
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
2014
>
Ord 2014-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 9:34:19 AM
Creation date
4/30/2014 1:41:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
4/21/2014
Retention
PERM
Document Relationships
4A Public Hearing 2014 0407
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0407
8B Consent 2014 0421
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0421
Inst 2014153467
(Approved)
Path:
\City Clerk\City Council\Recorded Documents\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Conditions of Approval February 20, 2014 <br />PLN2013-00045; 1333 Martinez Street Page 6 of 20 <br /> Pre-Construction Planning and Notification: Prior to the start of construction <br />activities involving below-ground work, information regarding known areas of <br />contamination shall be provided to the contractor by the Site owner. <br /> Site-Specific Health and Safety Worker Requirements: Each contractor will be <br />responsible for the health and safety of their own workers, including, but not <br />limited to, preparation of their own health and safety plan (HSP) and injury and <br />illness prevention plan (IIPP). The purpose of these documents is to provide <br />general guidance to the work hazards that may be encountered during each phase <br />of construction activities <br /> Contractors are also required to determine the requirements for worker training, <br />based on the level of expected contact to soil, soil vapor, and groundwater <br />associated with the contractor’s activities and locations. The HSP shall contain <br />provisions for limiting and monitoring chemical exposure to construction <br />workers, chemical and non-chemical hazards, emergency procedures, and standard <br />safety protocols. Depending upon known conditions at the time of site <br />development, employees conducting earthwork activities at the Site may be <br />required to complete a 40-hour HAZWOPER training course (29 CFR 1910.120 <br />(e)), including respirator and personal protective equipment training. <br /> Construction Impact Mitigation Measures: During construction, measures shall be <br />taken by contractors to minimize dust generation, storm water runoff and tracking <br />of soil off the Sites. In addition, measures will be taken to reduce the potential for <br />the creation of preferential pathways (vertical or horizontal) for COPCs detected <br />at the Sites during the planned subsurface investigations of soil, soil gas and/or <br />groundwater beneath the Sites. Construction impact mitigation measures are <br />described below. <br /> Site Control: Site control procedures shall be implemented to control the flow of <br />personnel, vehicles and materials in and out of the Sites while working in known <br />contaminated areas. (Currently, there are no known contaminated areas.) The <br />control measures described below will help control the spread of COPCs. <br /> The perimeter of the sites shall be fenced. Access and egress shall be controlled <br />at the appropriate locations. Signs will be posted instructing visitors to sign in at <br />the project support areas at all site entrances. <br /> Equipment Decontamination: Contractors whose vehicles and construction <br />equipment contact soil that is suspected of being contaminated shall be required to <br />clean the equipment upon leaving the contaminated area. A decontamination area <br />will be established near the construction exit of each area. Soil will be removed <br />from the equipment and vehicles before leaving the contaminated area. Cleaning <br />methods used may include dry methods, such as brushing, scraping, or <br />vacuuming. If dry methods are not effective, wet methods, such as steam cleaning <br />or pressure-washing, should be used. The contractor will contain, manage, and <br />collect samples of the rinse water for analytical testing by a state certified <br />laboratory prior to appropriate disposal. Decontamination procedures shall be <br />developed and implemented by the construction contractor to minimize the <br />possibility that equipment releases contaminated soil onto public roadways or to <br />on-Site areas containing “clean” cover materials or new paving. <br /> Personal Protective Equipment: Personal Protective Equipment (PPE) and <br />clothing shall be used to isolate workers from COPCs and physical hazards. The
The URL can be used to link to this page
Your browser does not support the video tag.