Laserfiche WebLink
• <br /> • <br /> Arterial/Collectors Rehabilitation Project List <br /> Rank Street Name Begin End PCI Cost (1) Cumulative Cost <br /> 1 Washington Av. I-880 Fargo 18 249,703 249,703 <br /> 2 Washington Av. Springlake Dr 1-880 18 10,428 260,131 <br /> 3 Marina Bl. I-880 Merced St. 37 368879 629,010 <br /> 2/8/99 Page 1 of 1 Prjlst.xls <br />