Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE 1999-00 <br /> Proposed <br /> TITLE 6 FINANCE <br /> Chapter 4 Fees <br /> §6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code(SLMC),San Leandro Administrative <br /> Code(SLAC)or the general laws of the State of California. <br /> Description Current Fee I Reference 1999-00 Proposed <br /> FIRE SERVICE RELATED–HAZARDOUS MATERIALS(cont.) <br /> 2. Accidental Release Program: Review of RMP by: SLMC 3-3-400 NEW FEE <br /> City Staff $65/hr. ' $75.00/hr. <br /> Outside consultant Direct Costs Direct Costs plus 10% <br /> Annual Fee $75.00 <br /> 3. Underground Hazardous Materials Storage SLMC 3-3-265 <br /> A. Annual Operating Permit(4): Each Tank $65.00 $75.00 <br /> a ' _ <br /> { B. New Tank Installation(5) <br /> — --_ $600.00 _—_ <br /> First Tank $520.00 <br /> 600...0........................................................................._....._..._..._._..................._. <br /> Each Additional $130.00 $150.00 <br /> � <br /> C. Tank Removal,Repair,Alterations(6) <br /> First Tank $260.00 $300.00 <br /> Each Additional $130.00 $150.00 <br /> • <br /> D. Minor Repairs and Alterations $65.00/hr. ' $75.00/hr. <br /> F <br /> 4. Contaminated Site Cleanup Program — <br /> A. Oversight of Remedial Investigations and Actions <br /> City Staff $65.00/hr. $75/hr. <br /> Outside Consultant Direct Costs Direct Costs plus 10% <br /> (4) Includes permit processing and two inspections annually(one annual and one reinspection)for compliance with applicable federal and state underground tank and/or hazardous <br /> waste laws and regulations and/or the Uniform Fire Code. Additional inspections will be charged at$6.5.40$75.00/hr. <br /> (5) Includes plan review,field inspections,and permit processing. Time for inspections is four hours for the first tank and two housr each additonal tank Additional inspections will be <br /> charged at$6500$75.00/hr. <br /> (6) Includes plan reviews,field inspections and permit processing. Time for inspections is two hours for the first tank and two hours each additional tank Additional inspections will be <br /> charged at$6590$75.00/hr. •5/19/99 21 Exhibit A <br />