My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2014 0616
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0616
>
8I Consent 2014 0616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2014 10:03:01 AM
Creation date
6/11/2014 10:50:24 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/16/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0616 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0616
Reso 2014-059
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
Reso 2014-060
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />STANDARD PUBLIC IMPROVEMENT AGREEMENT Page 2 of 13 <br />Draft 1- 1/29/2014; SL 4/23/2014 <br /> 3. Work; Inspections; Fees. The City Engineer or his designee shall inspect all of the <br />improvements made pursuant hereto to determine that they comply with all City regulations. Concurrently <br />with the execution of this agreement, the Owner shall deposit with the City the sum of Fifty Thousand and <br />Zero/100 DOLLARS ($50,000 No/100) to cover the cost of design review and inspection of the <br />improvements. Owner hereby agrees to increase the amount of the deposit to pay City the actual cost of <br />inspection if such costs should exceed the original deposit. <br /> 4. Modification for Unforeseeable Circumstances. Owner reserves the right to modify said <br />plans and specifications as the development progresses should unforeseen conditions occur, providing <br />written approval is first obtained from the City Engineer. The City shall bear no responsibility whatsoever <br />for work performed and rejected by the City Engineer. City reserves the right to make reasonable <br />modifications to the plans and specifications whenever field conditions and/or public safety require such <br />modifications. Owner shall pay City for all costs incurred in plan checking and inspection resulting from <br />said modifications. <br /> 5. Work; Time for Commencement and Performance. City hereby fixes the time for the <br />commencement of the required work to be on or before the 1st day of November 2014, and for its <br />completion to be on the 1st day of July 2016_. At least 15 calendar days prior to the commencement of work <br />hereunder, Owner shall notify the City Engineer in writing of the date fixed by Owner for commencement <br />thereof, in order that the City Engineer shall be able to provide services for inspection. <br /> 6. Location of Construction Yard. Owner agrees to locate any construction yard for the <br />storage of equipment, vehicles, supplies and materials, or the preparation or fabrication thereof, to be used in <br />connection with the installation of improvements for said project or the construction of buildings therein, in <br />such a manner so as to cause a minimum of inconvenience to persons living in the areas immediately <br />adjacent to said project, including installation of appropriate fencing and screening, and to obtain the <br />approval of the City Engineer as to the proposed location and standards of maintenance of the yard. <br />Immediately upon completion of the improvements to be constructed to which this agreement refers, Owner
The URL can be used to link to this page
Your browser does not support the video tag.