My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2014 0616
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0616
>
8I Consent 2014 0616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2014 10:03:01 AM
Creation date
6/11/2014 10:50:24 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/16/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0616 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0616
Reso 2014-059
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
Reso 2014-060
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />STANDARD PUBLIC IMPROVEMENT AGREEMENT Page 10 of 13 <br />Draft 1- 1/29/2014; SL 4/23/2014 <br /> 17. Title to Improvements. Title to, and ownership of, all improvements constructed <br />hereunder by Owner shall vest absolutely in City, upon completion and acceptance of such improvements by <br />City unless otherwise provided. <br /> 18. Repair or Reconstruction of Defective Work. Except as otherwise expressly provided in <br />this Agreement, and excepting only items of routine maintenance, ordinary wear and tear and unusual abuse <br />or neglect, Owner guarantees all work executed by Owner and/or Owner's agents, and all supplies, materials <br />and devices of whatsoever nature incorporated in, or attached to the work, or otherwise delivered to City as a <br />part of the work pursuant to the Agreement, to be free of all defects of workmanship and materials for a <br />period of one year after initial acceptance of the entire work by City. Owner shall repair or replace any or all <br />such work or material, together with all or any other work or materials which may be displaced or damaged <br />in so doing, that may prove defective in workmanship or material within said one year guarantee period <br />without expense or charge of any nature whatsoever to City. Owner further covenants and agrees that when <br />defects in design, workmanship and materials actually appear during the guarantee period, and have been <br />corrected, the guarantee period shall automatically be extended for an additional year to insure that such <br />defects have actually been corrected. <br /> In the event the Owner shall fail to comply with the conditions of the foregoing guarantee within <br />thirty (30) days time, after being notified of the defect in writing, City shall have the right, but shall not be <br />obligated, to repair or obtain the repair of the defect, and Owner shall pay to City on demand all costs and <br />expense of such repair. Notwithstanding anything herein to the contrary, in the event that any defect in <br />workmanship or material covered by the foregoing guarantee results in a condition which constitutes an <br />immediate hazard to the public health, safety, or welfare, City shall have the right to immediately repair, or <br />cause to be repaired, such defect, and Owner shall pay to City on demand all costs and expense of such <br />repair. The foregoing statement relating to hazards to health and safety shall be deemed to include either <br />temporary or permanent repairs which may be required as determined in the sole discretion and judgment of <br />City.
The URL can be used to link to this page
Your browser does not support the video tag.