My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2014136383
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2014
>
Inst 2014136383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2014 11:50:09 AM
Creation date
6/23/2014 11:46:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/16/2013
Recorded Document Type
Stormwater Treatment
Retention
PERM
Document Relationships
Inst 2013362145
(Superseded)
Path:
\City Clerk\City Council\Recorded Documents\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br /> Plans &Treatment Features <br /> City Engineer <br /> City of San Leandro <br /> 823 East 14th Street <br /> San Leandro, CA 94577 <br /> Property Address or APN:400 Polar Way,San Leandro,CA 94577 <br /> Property Owner:Victory Unlimited Construction LLC <br /> The Property Owner, its administrators, co-owners, executors, successors, heirs, <br /> assigns or any other persons, including any association (hereinafter referred to as <br /> "Property Owner") recognizes that the stormwater treatment measure described in <br /> Exhibit B, which plans and any amendments thereto are on file with the City of San <br /> Leandro Engineering and Transportation Department must be installed and <br /> maintained as indicated in the Agreement and as required by the NPDES Permit. <br /> Identifying Number of Type of Treatment Measure Location of Treatment <br /> Treatment Measure Measure on the Property <br /> CDS Unit No#1 CDS Unit—Deflective separation Southwest corner of <br /> technology screens,separates property at property line. <br /> and traps debris,sediment and <br /> oil and grease from stormwater <br /> runoff. <br /> Planters 1-5 per <br /> Bio-Retention Planters Bio-Retention Planters allow Stormwater Treatment <br /> No #1,2,3,4&5 infiltration and filtering of Plan Sheet by Kier& <br /> sediment from stormwater Wright Civil Engineers <br /> runoff. <br /> Attachments: <br /> i) Stormwater Treatment Plan By Kier&Wright Civil Engineers <br /> 2) On-Sit Storm Drain Elevation Plan Sheet by Base&Birge Engineers <br /> 3) Storm Drain Control Plan Sheet by Base&Birge Engineers <br /> 4) Contech CDS Unit Operation, Design,Performance and Maintenance Guide <br />
The URL can be used to link to this page
Your browser does not support the video tag.