My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2014136383
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2014
>
Inst 2014136383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2014 11:50:09 AM
Creation date
6/23/2014 11:46:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/16/2013
Recorded Document Type
Stormwater Treatment
Retention
PERM
Document Relationships
Inst 2013362145
(Superseded)
Path:
\City Clerk\City Council\Recorded Documents\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CDS Dial-Ile-ter Distance from Water Surface Sediment <br /> Model to Top of Sediment Pile Storage Capacity <br /> ft rri ft rn yd3 <br /> CDS2015-4 4 1.2 3.0 0.9 0.5 0.4 <br /> CDS2020 5 1.5 3.5 1.1 1.3 1.0 <br /> CDS3020 6 1.8 4.0 1.2 2.1 1.6 <br /> CDS3035 6 1.8 5.0 1.5 2.1 1.6 <br /> CDS4040 8 2.4 <br /> 5-7 1.7 5,6 4.3 <br /> Table 1:CDS Maintenance Indicators and Sediment Storage Capacities <br /> Note:To avoid underestimating the volume of sediment in the chamber, carefully lower th e <br /> measuring device to the top of the sediment pile. Finer silty particles at the pile <br /> he top of the pil <br /> may be more difficult to feel with a measuring stick.These finer particles typically offer less <br /> resistance to the end of the rod than larger particles toward the bottom of the pile. <br /> 6 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.