My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2014 Chang Income Property Partnership LP
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2014
>
Agmt 2014 Chang Income Property Partnership LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 6:10:52 PM
Creation date
6/26/2014 11:56:58 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/16/2014
Retention
PERM
Document Relationships
Reso 2014-059
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Immediately upon completion of the improvements to be constructed to which this agreement refers,Owner <br /> agrees to cease using the construction yard, clear the site and restore it to its original condition, and to <br /> remove therefrom all supplies,materials,equipment, or vehicles being stored or kept thereon. Owner agrees <br /> not to use the construction yard in connection with the installation of improvements or construction of <br /> buildings elsewhere. City may extend the time within which the construction yard may be used or within <br /> which supplies, materials, equipment or vehicles may be stored or kept thereon if City shall determine that <br /> the granting of such extension will not be detrimental to the public welfare. No extension will be made <br /> except on the basis of a written application made by Owner to the City Engineer stating fully the grounds <br /> and facts relied upon for such extension. <br /> 7. Rights-of-Way Free From Obstruction. Owner agrees to keep and maintain all areas <br /> within the improved or partially improved public streets or public rights-of-way contiguous and adjacent to <br /> and within the hereinabove referred to Property, including streets being constructed and/or improved <br /> pursuant to this agreement, free and clear of all building materials, dirt, mud, sand, gravel, rocks, bricks, <br /> stones, shingles, roofing material, lumber, tool sheds, construction buildings and other similar items at all <br /> times during the improvement and construction of the improvement and all buildings and other structures <br /> within said project. <br /> 8. Extension. The dates for commencement and completion of the work of construction may <br /> be extended as herein provided. The City Engineer shall extend said dates for delays in said work actually <br /> caused by riots, strikes, lockouts, fires,earthquakes,flood and conditions resulting therefrom. Extension of <br /> said dates for any other cause shall be made only by the City Engineer. The City Engineer shall be the sole <br /> and final judge as to whether good cause has been shown to entitle Owner to an extension. Any extension <br /> granted pursuant to this paragraph shall not obligate City in any manner to grant other requests for <br /> extension. <br /> 9. Request for Extension.,Granting.Any request for extension of any commencement and <br /> completion date shall be in writing, shall fully state the facts and grounds relied upon for said extension,and <br /> STANDARD PUBLIC IMPROVEMENT AGREEMENT Page 3 of 13 <br /> Draft 1-1/29/2014;SL 4/23/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.