My WebLink
|
Help
|
About
|
Sign Out
Home
8A Consent 2014 0721
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0721
>
8A Consent 2014 0721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 11:01:24 AM
Creation date
7/16/2014 5:45:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Draft Minutes
Document Date (6)
7/7/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0721 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0721
Minutes 2014 0707
(Superseded by)
Path:
\City Clerk\City Council\Minutes\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
July 7, 2014City Council Draft Minutes <br />Inc. for Citywide Janitorial Services (authorizes an agreement in an <br />amount not to exceed $543,272 from the Building Maintenance Fund) <br />A motion was made by Councilmember Prola, seconded by Councilmember <br />Souza, that this resolution be adopted. The motion carried by the following <br />vote. <br />Aye:Cassidy, Cutter, Gregory, Lee, Prola, Souza6 - <br />Enactment No: Reso 2014-069 <br />8.E.14-276 Staff Report for Resolution Extending the Business License Tax <br />Holiday Through December 31, 2014 <br />14-277 RESOLUTION Extending the Business License Tax Holiday Through <br />December 31, 2014 (extends the waiver of business license tax to all <br />businesses that are new to San Leandro and physically located in the <br />City excluding those classified as residential and commercial rental <br />property owners, amusement devices, or waste disposal sites) <br />A motion was made by Vice Mayor Lee, seconded by Councilmember Souza, <br />that this resolution be adopted. The motion carried by the following vote. <br />Aye:Cassidy, Cutter, Gregory, Lee, Prola, Souza6 - <br />Enactment No: Reso 2014-070 <br />8.G.14-217 Staff Report for a Resolution Rejecting All Bids for the Hesperian <br />Boulevard/Springlake Drive Railroad Crossing Improvements Project, <br />Project No. 12-150-38-325 <br />14-220 RESOLUTION Rejecting All Bids for the Hesperian <br />Boulevard/Springlake Drive Railroad Crossing Improvements Project, <br />Project No. 12-150-38-325 (rejects all bids as recommended by the <br />Engineering and Transportation Director) <br />A motion was made by Vice Mayor Lee, seconded by Councilmember Prola, <br />that this resolution be adopted. The motion carried by the following vote. <br />Aye:Cassidy, Cutter, Gregory, Lee, Prola, Souza6 - <br />Enactment No: Reso 2014-071 <br />8.I.14-253 Staff Report for a Resolution Accepting the Engineer's Report for <br />Fiscal Year 2014-15 for the Heron Bay Maintenance Assessment <br />District, Assessment District No. 96-3 and Ordering the Levy and <br />Collection of Assessments within the Heron Bay Maintenance <br />Assessment District; Assessment District No. 96-3 for Fiscal Year <br />2014-15 <br />14-254 RESOLUTION Accepting the Engineer’s Report for Fiscal Year <br />2014-15 for the Heron Bay Maintenance Assessment District, <br />Assessment District No. 96-3 (provides funding for the on-going <br />maintenance of certain public facilities constructed as part of the <br />Page 5City of San Leandro Printed on 7/11/2014
The URL can be used to link to this page
Your browser does not support the video tag.