Laserfiche WebLink
<br />(d) Operations at the facility change in a way that materially increases <br />the potential of fire, explosion, or unplanned release of hazardous <br />waste. <br /> <br />(e) The list of emergency coordinators changes. <br /> <br />(f) The list of emergency equipment changes. <br /> <br />4. Monitoring. <br /> <br />a. Upon reasonable notice, the City, their designated representatives of other <br />agencies, may enter a parcel on which a conditional use permit for a haz- <br />ardous waste facility has been granted for the purpose of monitoring the op- <br />eration of the facility. <br /> <br />b. The holder of a conditional use permit for a hazardous waste facility shall re- <br />port quarterly to the City the amount, type, and disposition of all wastes pro- <br />cessed by the facility. Included in the report will be copies of all manifests <br />showing the delivery and types of hazardous waste materials. <br /> <br />b.c. All structures shall remain accessible for inspection purposes. <br /> <br />5. Closure Plan. <br /> <br />The owner or operator of a hazardous waste management facility shall submit a <br />written closure plan. A copy of the approved plan and all revisions to the plan <br />shall be kept at the facility until closure is completed. The plan shall identify steps <br />necessary to completely or partially close the facility at the end of its intended <br />operating life. The closure plan shall include at least: <br /> <br />a. A description of how and when the facility will be partially closed, if applica- <br />ble, and finally closed. The description shall identify the maximum extent of <br />the operation that will be open during the life of the facility. <br /> <br />b. An estimate of the maximum inventory of wastes in storage and in treatment <br />at any time during the life of the facility. <br /> <br />c. A description of the steps needed to decontaminate facility equipment during <br />closure. <br /> <br />d. An estimate of the expected year of closure and a schedule for final closure. <br />The schedule shall include, at a minimum, the initial time required to close <br />the facility and the time required for intervening closure activities, which will <br />allow tracking of the progress of closure. <br />Exhibit G: Proposed Amended Article16 Page 44 <br />Note: underline and bolded text represents new text; strike-through text represents text to be eliminated