My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2014-078
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2014
>
Reso 2014-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 3:39:21 PM
Creation date
7/23/2014 3:39:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/21/2014
Retention
PERM
Document Relationships
4C Public Hearing 2014 0721
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0721
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
administratively approve minor changes, or for more substantial changes, require review <br /> by the Planning Commission and City Council as a modification to the Planned <br /> Development. <br /> III. BUILDING AND SAFETY SERVICES CONDITIONS <br /> A. All required Building Permits shall be obtained prior to construction of the gates and <br /> fencing for the Floresta Gardens residential condominium community at Caliente Drive <br /> intersecting Washington Avenue. <br /> VI. ENGINEERING & TRANSPORTATION DEPARTMENT REQUIREMENTS <br /> A. Pursuant to Government Code Section 66020, including Section 66020 (d) (1), the City <br /> HEREBY NOTIFIES the applicant for this Project that the 90-day approval period (in <br /> which the applicant may protest the imposition of any fees, dedications, reservations, or <br /> other exactions imposed on this Project by these Conditions of Approval)will begin on the <br /> date of the conditional approval of this Project. If the applicant/property owner fails to file a <br /> protest within this 90-day period, complying with all of the requirements of Government <br /> Code Section 66020, they will be legally barred,from later challenging any such fees, <br /> dedications,reservations or other exactions. <br /> B. Design review fees, development impact fees, permit fees, inspection fees, and any other <br /> fees charged by the City or other reviewing agencies for the review, approval, permitting <br /> and inspection of the above listed public improvements shall be paid by the Applicant. <br /> C. Prior to the issuance of building permits for the project, the Developer shall obtain an <br /> Encroachment Permit from the Engineering and Transportation Department for any work <br /> within public right of way. <br /> D. Applicant shall remove any broken and uplifted sidewalk, curb and gutter along the full <br /> project frontage and shall construct new City standard sidewalk driveway, curb and gutter <br /> in the same location and alignment as the existing curb and gutter. <br /> V. ALAMEDA COUNTY FIRE DEPARTMENT REQUIREMENTS <br /> A. The project shall comply with the applicable Building and Fire Codes as adopted by the <br /> City of San Leandro. Required emergency vehicle access shall be provided on the <br /> building permit plans to the satisfaction of the Fire Department. In addition, a Knox key <br /> switch is required at the gate in the driveway. <br /> VI. FENCING AND SCREENING REQUIREMENTS <br /> A. All fencing and walls on the project site shall be structurally sound, graffiti-free and well <br /> maintained at all times. <br /> B. Barbed or razor wire shall not be installed on any fence, wall or building on the project <br /> site. <br /> Recommended Conditions of Approval July 21,2014 <br /> PLN2014-00006;Floresta Gardens Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.