My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2014 Chill Build LLC
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2014
>
Agmt 2014 Chill Build LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 6:11:40 PM
Creation date
7/23/2014 3:39:22 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/21/2014
Retention
PERM
Document Relationships
Reso 2014-082
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Work; Satisfaction of City Engineer. All of the work on the required improvements is to be <br /> done at the places, with the materials, in the manner, and at the grades, all as shown upon the approved <br /> plans and specifications,and to the reasonable satisfaction of the City Engineer. <br /> 3. Work; Inspections; Fees. The City Engineer or his designee shall inspect all of the <br /> improvements made pursuant hereto to determine that they comply with all City regulations. Concurrently <br /> with the execution of this agreement, the Owner shall deposit with the City the sum of Fifty Thousand <br /> DOLLARS ($50,000.00) to cover the cost of plan review and inspection of the improvements. Owner <br /> hereby agrees to increase the amount of the deposit to pay City the actual cost of inspection if such costs <br /> should exceed the original deposit. <br /> 4. Modification for Unforeseeable Circumstances. Owner reserves the right to modify said <br /> plans and specifications as the development progresses should unforeseen conditions occur, providing <br /> written approval is first obtained from the City Engineer. The City shall bear no responsibility whatsoever <br /> for work performed and rejected by the City Engineer. City reserves the right to make reasonable <br /> modifications to the plans and specifications whenever field conditions and/or public safety require such <br /> modifications. Owner shall pay City for all costs incurred in plan checking and inspection resulting from <br /> said modifications. <br /> 5. Work; Time for Commencement and Performance. City hereby fixes the time for the <br /> commencement of the required work to be on or before the 1st day of October 2014, and for its completion <br /> to be on the 30th day of September 2015. At least 15 calendar days prior to the commencement of work <br /> hereunder, Owner shall notify the City Engineer in writing of the date fixed by Owner for commencement <br /> thereof, in order that the City Engineer shall be able to provide services for inspection. <br /> 6. Location of Construction Yard. Owner agrees to locate any construction yard for the <br /> storage of equipment, vehicles, supplies and materials, or the preparation or fabrication thereof, to be used <br /> in connection with the installation of improvements for said project or the construction of buildings therein, <br /> in such a manner so as to cause a minimum of inconvenience to persons living in the areas immediately <br /> STANDARD PUBLIC IMPROVEMENT AGREEMENT Page 2 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.