Laserfiche WebLink
adjacent to said project, including installation of appropriate fencing and screening, and to obtain the <br /> approval of the City Engineer as to the proposed location and standards of maintenance of the yard. <br /> Immediately upon completion of the improvements to be constructed to which this agreement refers, Owner <br /> agrees to cease using the construction yard, clear the site and restore it to its original condition, and to <br /> remove therefrom all supplies,materials,equipment,or vehicles being stored or kept thereon. Owner agrees <br /> not to use the construction yard in connection with the installation of improvements or construction of <br /> buildings elsewhere. City may extend the time within which the construction yard may be used or within <br /> which supplies, materials, equipment or vehicles may be stored or kept thereon if City shall determine that <br /> the granting of such extension will not be detrimental to the public welfare. No extension will be made <br /> except on the basis of a written application made by Owner to the City Engineer stating fully the grounds <br /> and facts relied upon for such extension. <br /> 7. Rights-of-Way Free From Obstruction. Owner agrees to keep and maintain all areas <br /> within the improved or partially improved public streets or public rights-of-way contiguous and adjacent to <br /> and within the hereinabove referred to Property, including streets being constructed and/or improved <br /> pursuant to this agreement, free and clear of all building materials, dirt, mud, sand, gravel, rocks, bricks, <br /> stones, shingles, roofing material, lumber, tool sheds, construction buildings and other similar items at all <br /> times during the improvement and construction of the improvement and all buildings and other structures <br /> within said project. <br /> 8. Extension. The dates for commencement and completion of the work of construction may <br /> be extended as herein provided. The City Engineer shall extend said dates for delays in said work actually <br /> caused by riots, strikes, lockouts, fires,earthquakes,flood and conditions resulting therefrom. Extension of <br /> said dates for any other cause shall be made only by the City Engineer. The City Engineer shall be the sole <br /> and final judge as to whether good cause has been shown to entitle Owner to an extension. Any extension <br /> granted pursuant to this paragraph shall not obligate City in any manner to grant other requests for <br /> extension. <br /> STANDARD PUBLIC IMPROVEMENT AGREEMENT Page 3 of 14 <br />