My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2014206578
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2014
>
Inst 2014206578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2014 3:02:00 PM
Creation date
9/4/2014 3:01:59 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/27/2014
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D: Landscape Based Inspection and Maintenance Checklist <br /> Property Address: 1550 East 14th Street, San Leandro, CA Property Owner: Innisfree Ventures, LLC <br /> Treatment Measure No.: 1 Date of Inspection: Inspector(s): <br /> Type of Inspection: 0 Monthly El Pre-Wet Season 0 After heavy runoff(1"or greater) <br /> 0 End of Wet Season 0 Other: <br /> Type of Treatment Measure: Z Bioretention Area 0 Flow-Through Planter 0 Tree Well Filter 0 Vegetated Swale <br /> Defect Conditions When Maintenance Maintenance Comments* Results Expected When Maintenance is <br /> Is Needed Needed(YIN) Performed <br /> 1. Trash and Trash and debris accumulated Treatment measure is free of trash and <br /> Debris in the treatment measure. debris. <br /> Accumulation <br /> 2. Standing Water When water stands in the No standing water after 5 days of rain <br /> treatment measure between event. <br /> storms and does not drain <br /> within 5 days after rainfall. <br /> Conditions within treatment <br /> measure provide mosquito <br /> breeding habitat. <br /> 3, Stormwater Downspouts, curb cuts, All stormwater intermediaries are <br /> Intermediaries overflow pipes, inflow pipes, cleaned and repaired. Treatment <br /> outflow pipes, and/or bubble measure flows as intended per design <br /> ups are damaged and/or specifications. <br /> clogged with sediment and/or <br /> debris. Splash blocks or rocks <br /> are damaged or missing. <br /> 4. Erosion Treatment measure has There is no evidence of channeling, <br /> channels, ruts or holes, and/or ruts and holes, soil exposure or other <br /> soil exposure due to erosion, evidence of erosion. <br /> *Describe maintenance completed and if needed maintenance was not conducted, note when it will be done. <br />
The URL can be used to link to this page
Your browser does not support the video tag.