My WebLink
|
Help
|
About
|
Sign Out
Home
Supplement 8E Consent 2014 0915
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0915
>
Supplement 8E Consent 2014 0915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 12:42:27 PM
Creation date
9/10/2014 12:41:41 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/15/2014
Retention
PERM
Document Relationships
8E Consent 2014 0915
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0915
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
BayCAP2 <br /> <br />Exhibit B: Optional Additional Infrastructure Services Provided by ABM <br /> <br />Sample Additional Electrical Upgrade & Installation Infrastructure Services <br /> (to be customized by ABM and Site Host) <br /> <br /> Install ______ Wheel Stop(s) <br /> Install ______ Protective Bollard(s) <br /> Transformer ________ KVA <br /> Wall Core Qty ________ <br /> Floor Core Qty ________ <br /> J - Box Qty ________ <br /> Trenching ________ ft <br /> Concrete Cut/Patch ________ ft <br /> Asphalt Cut/Patch ________ ft <br /> Landscape Repair ________ ft <br /> <br /> <br />Description of Work to be Performed: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Materials List: <br /> <br /> <br /> <br />Materials $: <br /> <br />Labor $: <br /> <br />Tax $: <br /> <br />Total $: <br /> <br />Note: All work performed to local and NEC requirements by California State Certified Electricians. <br /> <br />ABM Electrical Power Services, LLC (ABEPS) Terms and Conditions <br />The following items are in addition to Section VII – ABM Terms and Conditions within this BayCAP Approval to <br />Proceed document. Authorization to proceed with the work outlined in this quotation shall constitute Site Host <br />(“Buyer's”) acceptance of these terms and conditions in full. Oral authorizations to proceed must be confirmed to <br />ABMEPS in writing (Fax or e-mail) within 24 hours. If there is a conflict or discrepancy between terms and <br />conditions in the Buyer's purchase authorization and this quotation, this quotation shall prevail unless specifically <br />authorized, in writing, by ABM Electrical Power Services, LLC <br /> <br />Terms of Payment: 1. Terms are net thirty (30) days. Any invoice not paid within thirty (30) days from the date of <br />invoice will be subject to a service charge equal to the lesser of One and One-half percent (1.5%) per month on <br />account balances or the maximum percentage permitted by law. 2. At ABMEPS’s option, customers may be <br />invoiced on a monthly basis for services provided over more than one month. 3. All pricing and payment terms <br />contained herein are contingent upon a favorable Credit Report for the customer/client to whom this quotation is <br />provided. Upon receipt of a less than favorable credit report ABMEPS reserves the right to withdraw this proposal, <br /> <br /> Bay Area Charge Ahead Project 2 - Approval to Proceed | July 30, 2014 | page 16
The URL can be used to link to this page
Your browser does not support the video tag.