Laserfiche WebLink
BayCAP2 <br /> <br />EMT surface mount conduit and wire will be provided and installed onto the existing <br />structure with straps in surface mounted configuration -- and a maximum of up to twenty- <br />five (25) feet of underground trenching will be provided in planter and ¾” PVC underground <br />conduit and wire will be installed from structure to new concrete base of EVSE. <br /> <br />ChargePoint 4000 Series Charging Stations <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Additional ABM or <br />Site Host Provided Services <br /> <br />a) The Site Host may also opt to self-perform additional scope beyond Installation Profile <br />Option #1, #2, or #3. This additional scope, if needed, is referenced as Exhibit C of this <br />document. <br />b) If upon the site survey conducted by ABM, it is determined that there is additional <br />required work beyond the scope detailed in Installation Profile Options #1, #2, or #3 <br />above, ABM will provide an additional estimate for costs to complete the EVSE <br />installation. These proposals, if desired, will be added as Exhibit B to this Agreement, <br />while Site Host approval is included as Exhibit A of this document. <br />c) In the event that the Site Host’s site does not have sufficient electrical infrastructure to <br />support the addition of EV charging infrastructure, ABM may offer options or potential <br />solutions that would help reduce or balance current electrical loads within a facility. <br />Some options are designed to free up electrical capacity while others are designed to <br />minimize peak load spikes and their resulting demand fees. Any such solutions will be <br />implemented only upon Site Host approval. <br />d) In the case of additional services by either party, ABM will cooperate with the Site Host <br />to coordinate satisfactory completion of the installation of the EVSE pursuant to the <br />requirements of the project. <br /> <br /> ABM Exclusions and Qualifications <br />Unless specifically noted otherwise: <br />a) Electrical design work to accommodate non-standard configurations is excluded and will <br />be charged as additional as required, with agreement of Site Host. <br />b) Electrical permit, plan check fees, and utility charges are excluded and must be paid by <br />Site Host where required. <br />c) Pricing is based on existing electrical system having adequate physical space and <br />amperage available. <br /> <br /> Bay Area Charge Ahead Project 2 - Approval to Proceed | July 30, 2014 | page 5