My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2014241338
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2014
>
Inst 2014241338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2014 11:11:11 AM
Creation date
10/17/2014 4:07:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
8/12/2014
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B Standard construction dust control procedures, such as wetting, daily roadwashing <br /> and other maintenance functions to control emissions, shall be implemented at all <br /> times during outdoor construction. Dust generating activities such as grading, <br /> excavation, paving etc., shall be scheduled the early morning and other hours <br /> when wind speeds are low. <br /> C. The applicant shall prepare a construction truck route plan that would restrict <br /> trucks to arterial streets that have sufficient pavement section to bear the heavy <br /> truck traffic, thereby minimizing noise and traffic impacts to the community. The <br /> construction truck route plan shall be reviewed and approved by the City <br /> Engineering and Transportation Department prior to receipt of the grading permit. <br /> D. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m., unless <br /> otherwise approved by the City Engineer. <br /> E. Procedures with the highest noise potential shall be scheduled for daylight hours, <br /> when ambient noise levels are highest. <br /> F. The applicant shall require contractor(s) to employ the quietest equipment or, if <br /> not alternative is available,to muffle/control noise from available equipment. <br /> G. All construction contracts shall include the following requirements: 1) Unpaved <br /> construction sites shall be sprinkled with water at least twice per day; 2) Trucks <br /> hauling construction materials shall be covered with tarpaulins or other effective <br /> covers; 3) Streets surrounding demolition and construction sites shall be swept at <br /> least once per day; and 4) Paving shall be done as soon as possible. City shall <br /> charge developer, and developer shall pay, for all costs of sweeping city streets in <br /> the vicinity of the project as necessary to control dust and spillage. <br /> H. The property shall be secured during demolition and construction with a six (6) <br /> foot tall chain link fence and any other security measures in accordance with <br /> recommendation of the San Leandro Police Department. <br /> VIII. LANDSCAPING <br /> A. The number, types and location of the new trees, shrubs and groundcover shall be <br /> installed in compliance with the proposed landscape plan as noted (Exhibit A1.3). <br /> B. All landscape improvements shall comply with San Leandro Zoning Code Article <br /> 19 Landscape Requirements, attested by a letter report signed by a licensed <br /> landscape designer. <br /> C. Prior to issuance of either a Certificate of Occupancy or Approval of the Final <br /> inspection, all required landscaping and irrigation shall be installed per the <br /> approved plans, with respect to size, number, and species of plants, and provision <br /> of adequate irrigation coverage. <br /> Agreement to Conditions August 12, 2014 <br /> PLN2014-00019 Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.