<br />PROJECT TITLE: Annual Sidewalk Program 2014-15
<br />PROJECT NO.: 2015.0060
<br />BID NO.: 14-15.007
<br />BID SUMMARY
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that
<br />such bid has been found to be responsive or accepted as complete by the City.
<br />An award of contract, if any, is subject to approval of the City Council and/or the
<br />City Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />BID OPENING
<br />DATE: Wednesday, October 8, 2014
<br />TIME: 3:00 p.m.
<br />LOCATION: City Clerk's Office
<br />ENGINEER'S ESTIMATE
<br />Date Approved: 9/11/2014
<br />Prepared by: A. Osakwe
<br />AJW Construction
<br />966 81 st Avenue
<br />Oakland, CA 94621
<br />Phone: (510) 568-2300
<br />Fax: (510) 639-1578
<br />Spencon Construction, Inc.
<br />P.O. Box 1220
<br />Danville, CA 94526
<br />Phone: (925) 984-2581
<br />Fax: (925) 984-2583
<br />Rosas Brothers Construction
<br />4731 Coliseum Way
<br />Oakland, CA 94601
<br />Phone: (510) 534-1077
<br />Fax: (510) 534-5077
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />12
<br />Grind raised concrete sidewalk to
<br />100 LF
<br />$20.00
<br />$2,000.00
<br />$20.00
<br />$2,000.00
<br />$75.00
<br />$7,500.00
<br />$20.00
<br />$2,000.00
<br />flush with adjacent grade, within
<br />48 hrs of notification
<br />13
<br />Install cast iron pipe curb drain
<br />40 LF
<br />$24.00
<br />$960.00
<br />$15.00
<br />$600.00
<br />$70.00
<br />$2,800.00
<br />$20.00
<br />$800.00
<br />per drawing. 212 case 3101
<br />14
<br />Remove and reset pavers at
<br />400 SF
<br />$18.50
<br />$7,400.00
<br />$15.00
<br />$6,000.00
<br />$24.00
<br />$9,600.00
<br />$12.50
<br />$5,000.00
<br />existing tree per drawing 436
<br />case 3101
<br />15
<br />Install retrofit frame for tree grate
<br />1 EA
<br />$1,750.00
<br />$1,750.00
<br />$1,500.00
<br />$1,500.00
<br />$1,275.00
<br />$1,275.00
<br />$1,500.00
<br />$1,500.00
<br />in existing concrete per drawing
<br />438A and B.case 3101
<br />16
<br />Install cast in place frame for tree
<br />2 EA
<br />$1,500.00
<br />$3,000.00
<br />$1,500.00
<br />$3,000.00
<br />$1,275.00
<br />$2,550.00
<br />$2,000.00
<br />$4,000.00
<br />grate per drawing 438A and B
<br />case 3101. Including all steel but
<br />excluding concrete
<br />17
<br />Install cast iron tree grate per
<br />2 EA
<br />$1,500.00
<br />$3,000.00
<br />$1,200.00
<br />$2,400.00
<br />$1,600.00
<br />$3,200.00
<br />$2,000.00
<br />$4,000.00
<br />drawing 438A and B case 3101 .
<br />18
<br />Remove 4" Concrete and backfill
<br />300 SF
<br />$8.00
<br />$2,400.00
<br />$5.00
<br />$1,500.00
<br />$10.00
<br />$3,000.00
<br />$6.00
<br />$1,800.00
<br />with topsoil
<br />19
<br />Provide traffic control plan and
<br />2 Plans
<br />$2,150.00
<br />$4,300.00
<br />$550.00
<br />$1,100.00
<br />$2,500.00
<br />$5,000.00
<br />$600.00
<br />$1,200.00
<br />implement traffic control per
<br />section 7-10.3.3 and 7-10.3.4 with
<br />a flashing arrow panel
<br />20
<br />Provide traffic control plan and
<br />2 Plans
<br />$1,750.00
<br />$3,500.00
<br />$500.00
<br />$1,000.00
<br />$2,500.00
<br />$5,000.00
<br />$400.00
<br />$800.00
<br />implement traffic control per
<br />section 7-10.3.3 and 7-10.3.4
<br />without a flashing arrow panel
<br />Annual Sidewalk Repair Program 2014-15 Page 2 of 8 Printed 10/9/2014 @ 9:26 AM