My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2014 1103
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 1103
>
8G Consent 2014 1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2014 11:16:09 AM
Creation date
10/29/2014 9:27:56 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/3/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 1103 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 1103
Ord 2014-021
(Reference)
Path:
\City Clerk\City Council\Ordinances\2014
Ord 2014-022
(Reference)
Path:
\City Clerk\City Council\Ordinances\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
(a) Name, address and User classification numbe code (SIC) of applicant; <br />(b) Volume of wastewater to be discharged; <br />(c) Wastewater constituents and characteristics OnGluding but not limited te <br />(d) Time and duration of discharge; <br />(e) Average and maximum wastewater flow rates, including daily, monthly <br />and seasonal variations, if any; <br />(f) Site plans, floor plans, mechanical and plumbing plans and details to show <br />all sewers and appurtenances by size, location and elevation; <br />(g) Description of activities, facilities and plant processes on the premises <br />including all materials, preGesses and types of materials whinh aro that will or could be <br />discharged; <br />(h) Each product produced by type, amount, and rate of production; <br />(i) Number and type of employees, and hours of work; <br />Q) Spill prevention plans; <br />(k) Solvent management plans; <br />(1) Pollution prevention plan; <br />(m) Storm water pollution prevention plan and monitoring plan; <br />(n) Any other information as may be deemed by the City to be necessary to <br />evaluate the permit application. <br />The City will evaluate the data furnished by the User and may require additional <br />information. After evaluation and approval of all the data required, the City may issue a <br />permit, subject to specific terms or conditions provided therein. The holder of all permits <br />issued hereunder shall be subject at all times to all applicable Federal, State, and local <br />laws and regulations. <br />Section 3-14-510. Major Contributing Industries. <br />All major contributing industries proposing to discharge into the City sanitary <br />sewer must obtain a permit within sixty (60) days of the commencement of operation. <br />Section 3-14-515. Industrial Users. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.