My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2014 1215
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 1215
>
8F Consent 2014 1215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2014 1:49:14 PM
Creation date
12/9/2014 5:54:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/15/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 1215 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 1215
Reso 2014-139
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
$AN City of San Leandro <br /> Meeting Date: December 15, 2014 <br /> Staff Report <br /> File Number: 14-482 Agenda Section: CONSENT CALENDAR <br /> Agenda Number: 8.F. <br /> TO: City Council <br /> FROM: Chris Zapata <br /> City Manager <br /> BY: Uchenna Udemezue <br /> Engineering & Transportation Director <br /> FINANCE REVIEW: David Baum <br /> Finance Director <br /> TITLE: Staff Report for a Resolution Accepting the Work for the City Hall South End <br /> Roof Replacement Project, Project No. 2013.0300 <br /> SUMMARY AND RECOMMENDATIONS <br /> Staff recommends that the City Council accept the work by State Roofing Systems on Project <br /> No. 2013.0300, and direct staff to file the Notice of Completion, release the performance and <br /> payment bonds, and release the maintenance bond upon completion of the one year <br /> maintenance period. <br /> BACKGROUND <br /> In 2006, a roof survey was conducted by Skyline Engineering to evaluate the condition of all <br /> roofs on City-owned buildings. The survey included an assessment of roof condition and a <br /> budget estimate for repair/replacement. The portion of the City Hall roof over the Finance <br /> Department and Environmental Services offices was found to be in poor condition and <br /> replacement was recommended. <br /> This project removed the roof over the south end of City Hall and installed a new single ply <br /> roofing system. <br /> Analysis <br /> The Contractor installed the above described improvements. Work was performed in <br /> compliance with the contract documents and is now complete. <br /> The Contractor provided a 5-year warranty and the roofing manufacturer provided a 20-year <br /> warranty. <br /> Previous Actions <br /> City of San Leandro Page 1 Printed on 12/9/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.