My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2014 1215
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 1215
>
8G Consent 2014 1215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2014 1:49:31 PM
Creation date
12/9/2014 5:54:11 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/15/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 1215 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 1215
Reso 2014-140
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
$AN City of San Leandro <br /> Meeting Date: December 15, 2014 <br /> Staff Report <br /> File Number: 14-509 Agenda Section: CONSENT CALENDAR <br /> Agenda Number: 8.G. <br /> TO: City Council <br /> FROM: Chris Zapata <br /> City Manager <br /> BY: Uchenna Udemezue <br /> Engineering & Transportation Director <br /> FINANCE REVIEW: David Baum <br /> Finance Director <br /> TITLE: Staff Report for a Resolution Accepting the Work for the Monarch Bay Drive <br /> Bridge Maintenance and Repair Project, Project No. 12-150-38-324 <br /> SUMMARY AND RECOMMENDATIONS <br /> Staff recommends acceptance of the work by Vortex Marine Construction, Inc., filing of the <br /> Notice of Completion, release of the performance and payment bonds, and release of the <br /> maintenance bond upon completion of the one year maintenance period. <br /> BACKGROUND <br /> The City owns and maintains several bridges, some of which are periodically inspected by <br /> Caltrans. Recent inspection reports for the bridge that carries Monarch Bay Drive over the <br /> Estudillo Canal (located immediately south of Marina Park) indicate that some of the concrete <br /> is damaged and that the bank at the northern abutment has eroded to the point that the <br /> abutment foundations are exposed. <br /> The project repaired damaged concrete on the underside of the bridge, rebuilt the <br /> embankment at the northern end of bridge, and sealed the bridge deck. <br /> Analysis <br /> This project installed the above described improvements. The work was performed in <br /> compliance with the contract documents and is now complete. <br /> Current Agency Policies <br /> Maintain and enhance the City's infrastructure. <br /> Previous Actions <br /> City of San Leandro Page 1 Printed on 12/9/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.