Laserfiche WebLink
$AN City of San Leandro <br /> Meeting Date: December 15, 2014 <br /> Staff Report <br /> File Number: 14-509 Agenda Section: CONSENT CALENDAR <br /> Agenda Number: 8.G. <br /> TO: City Council <br /> FROM: Chris Zapata <br /> City Manager <br /> BY: Uchenna Udemezue <br /> Engineering & Transportation Director <br /> FINANCE REVIEW: David Baum <br /> Finance Director <br /> TITLE: Staff Report for a Resolution Accepting the Work for the Monarch Bay Drive <br /> Bridge Maintenance and Repair Project, Project No. 12-150-38-324 <br /> SUMMARY AND RECOMMENDATIONS <br /> Staff recommends acceptance of the work by Vortex Marine Construction, Inc., filing of the <br /> Notice of Completion, release of the performance and payment bonds, and release of the <br /> maintenance bond upon completion of the one year maintenance period. <br /> BACKGROUND <br /> The City owns and maintains several bridges, some of which are periodically inspected by <br /> Caltrans. Recent inspection reports for the bridge that carries Monarch Bay Drive over the <br /> Estudillo Canal (located immediately south of Marina Park) indicate that some of the concrete <br /> is damaged and that the bank at the northern abutment has eroded to the point that the <br /> abutment foundations are exposed. <br /> The project repaired damaged concrete on the underside of the bridge, rebuilt the <br /> embankment at the northern end of bridge, and sealed the bridge deck. <br /> Analysis <br /> This project installed the above described improvements. The work was performed in <br /> compliance with the contract documents and is now complete. <br /> Current Agency Policies <br /> Maintain and enhance the City's infrastructure. <br /> Previous Actions <br /> City of San Leandro Page 1 Printed on 12/9/2014 <br />