My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2015 0120
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0120
>
4A Public Hearing 2015 0120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2015 5:08:32 PM
Creation date
1/14/2015 5:45:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/20/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0120 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0120
PowerPoint 4A Public Hearing 2015 0120 Housing Element
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0120
Reso 2015-006
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
Reso 2015-007
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
13 <br />HCD Comment: In Action 59.06-A, clarify that multi -family guidelines have already been developed <br />for the South Area and Downtown/TOD but have not been developed yet for Bayfair and the RM <br />zones in general. <br />City Response: Action 59.06-A is edited as follows (yellow test is added): <br />Continue to use the adopted multi -family design guidelines for the Downtown TOD and East <br />14'h Street South areas. Develop additional guidelines that apply more broadly to multi- <br />family projects on infill lots. <br />14 <br />HCD Comment: In Chapter 7, under Action 53.01 -B, clarify that the Bayfair Plan will be finished in <br />2017 and new zoning may not be in place until 2018. <br />City Response: In Chapter 7 matrix, page 7-3, edit "comments " column for 53.01-B as follows: <br />City received MTC grant and has issued :g RFP. Completion is <br />expected in 2016-2017. New zoning will be in place by 2018. <br />In addition, the following sentence will be added to the end of the Action 53.01-B narrative on Page <br />6-5 (tracked change version) <br />At minimum, the new Plan should lead to the rezoning of the 11 -acre Bayfair BART Station <br />parking lot from its current designation (Public/ Semi -Public) to a zoning district which <br />encourages and promotes high-density mixed use development. The designation should <br />establish a minimum density of 40 units per acre to maximize the potential use of this site <br />for multi -family housing development. The new zoning should be in place by 2018, within <br />one-year after the Plan is adopted. <br />15 <br />HCD Comment: In Chapter 7, under 53.01-C, clarify that this will happen around one year after the <br />General Plan is adopted, so if Plan is adopted in 2016 it will happen in 2017. <br />City Response: In Chapter 7 matrix, page 7-4, edit "comments " column for 53.01-C as follows: <br />Action already anticipated by General Plan Land Use Element and Map. To be <br />completed by 2017, within one year after General Plan Update. <br />In addition, the following sentence should be added to the Action 53.01-C narrative on Page 6-6 <br />(tracked change version): <br />Although multi -family housing is already a conditionally permitted use under the existing <br />Community Commercial (CC) zoning, the mixed use zoning would allow multi -family <br />housing and mixed use development by right, establish minimum (in addition to maximum) <br />densities, potentially improve the pedestrian scale and street environment, and expedite the <br />reuse of vacant and under -developed properties on these two corridors. The rezoning should <br />hould <br />take place by 2017, within one year of General Plan adoption. <br />HCD Comment: In Chapter 7, under 53.01 -D (Shoreline Area), clarify when the rezoning will be <br />16 <br />done (relative to completion of the Plan) <br />City Response: In Chapter 7 matrix, page 7-4, edit "timing" and"comments" column for 53.01-D as <br />follows: <br />Spring 15 <br />Plan and EIR likely to be considered in early 2015, <br />2016 <br />rezoning by 2016 <br />2015-2023 San Leandro Housing Element Proposed Addendum * November 19, 2014 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.