My WebLink
|
Help
|
About
|
Sign Out
Home
2A Work Session 2015 0126
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0126
>
2A Work Session 2015 0126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 9:59:45 AM
Creation date
1/21/2015 4:33:09 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/26/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0126 CSAmended+WS
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0126
PowerPoint 2A Work Session 2015 0126 Shoreline DEIR
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0126
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2022
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT DRAFT EIR <br />CITY OF SAN LEANDRO <br />BIOLOGICAL RESOURCES <br />removal of the existing pilings, docks and piers in the existing marina, creation of enhanced natural <br />shoreline along the interior of the existing marina, installation of new piers, docks and pedestrian bridge <br />over the mouth of the entrance to the existing marina, and installation of an aeration fountain to improve <br />water quality in the existing marina basin. Construction could result in disturbance to aquatic habitat of <br />the bay, requiring drilling and excavation for pier/dock installation and shoreline modifications, and <br />suspending silts and other substrate within the construction zone. This could result in a temporary <br />reduction in water quality, or inadvertent injury or loss of individual special -status fish species, if present <br />within the construction zone. The new piers and docks would shade areas of open water, but the removal <br />of the existing dock system in the marina basin would result in a substantial net reduction in shading of <br />open water habitat as part of the Project. Details of the Aeration fountain are not available, but special - <br />status and other fish species could be routinely entrained in the pumping system if adequate screening at <br />the intake locations is not provided and maintained. Appropriate construction avoidance measures would <br />be necessary to prevent possible loss of one or more of these species, and appropriate authorizations may <br />be required from NOAA Fisheries, USFWS, and/or CDFW where "take" of special -status fish species may <br />occur as a result of the in -water activities of the Project. This would be considered a significant impact. <br />Impact BIO -1B: Proposed development could result in inadvertent loss of special -status fish species and <br />other aquatic species as part of in -water construction activities if adequate controls are not implemented. <br />Mitigation Measure BIO -1B: Prevent Inadvertent Loss of Special -Status Fish and Aquatic Life. <br />Appropriate construction controls and restrictions shall be taken to prevent inadvertent loss of <br />special -status fish species and other aquatic life as a result of construction activities within or near <br />areas of tidal influence and open water habitat of San Francisco Bay to avoid possible inadvertent take <br />of Central California Coastal steelhead, green sturgeon, Delta smelt, Sacramento splittail, Central <br />Valley spring -run chinook salmon, and longfin smelt, if present in the area during the time of <br />construction. This shall be accomplished with the following provisions: <br />■ Adequate measures shall be taken to minimize disturbance and sedimentation in aquatic habitat <br />of the bay, which may include installation of silt curtains around in -water construction zones, <br />restrictions on in -water operations to low tide periods, and timing restrictions for in -water <br />construction, among other possible controls and restrictions. <br />■ Any pumping as part of dewatering construction areas or as part of the proposed aeration <br />fountain shall be adequately screened according to the latest screening guidelines of the CDFW, <br />USFWS, and NOAA Fisheries to prevent entrainment of special -status fish and other aquatic life <br />during their operation. <br />■ Any in -water construction activities shall be restricted to the period from June 15 through <br />October when stray or dispersing special -status fish species would most likely not be expected <br />within the affected areas. <br />■ The applicant shall obtain all necessary authorizations from the CDFW, NOAA Fisheries, and <br />USFWS as required by federal and State law for potential harm to special -status fish species. Such <br />authorization would be obtained as a result of interagency coordination through the Army Corps <br />Section 404 consultation and the CDFW Section 2081 Incidental Take Permit process. The Project <br />shall adhere to any additional conditions and restrictions required as part of the authorizations <br />from regulatory agencies. <br />PLACEWORKS 4.3-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.