My WebLink
|
Help
|
About
|
Sign Out
Home
2A Work Session 2015 0126
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0126
>
2A Work Session 2015 0126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 9:59:45 AM
Creation date
1/21/2015 4:33:09 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/26/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0126 CSAmended+WS
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0126
PowerPoint 2A Work Session 2015 0126 Shoreline DEIR
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0126
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2022
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT DRAFT EIR <br />CITY OF SAN LEANDRO <br />Exceeds BAAQMD Target? — Yes — — <br />Note: Emissions may not total to 100 percent due to rounding. New buildings would be constructed to the 2013 Building & Energy Efficiency Standards <br />(effective July 1, 2014). Assumes all fireplaces are gas -burning fireplaces in accordance with BAAQMD Regulation 6, Rule 3. <br />a. CalEEMod 2013.2.2. Based on year 2014 emission rates. No trip generation is assumed for the 16 live -aboard boat residences. <br />b. Starcrest, 2005. Port of Los Angeles Baseline Air Emissions Inventory. <br />c. BAAQMD did not include solid waste emissions when developing the per capita significance thresholds. Therefore, total GHG emissions with and <br />without the Waste Generation sector are included. If these emissions are included in the analysis for the Project, Project per capita emissions would be <br />6.9 MTCOZe/SP/yr. <br />d. Service population (SP) is based on 16 residents and 76 employees (existing) and 970 residents and 1,003 employees (Project). <br />Impact GHG-1: Implementation of the Project would directly or indirectly generate GHG emissions that <br />may have a significant impact on the environment. <br />Mitigation Measure GHG-1A: Residential developments that include garage parking shall be electrically <br />wired to accommodate electric vehicle charging. The location of the electrical outlets shall be <br />specified on building plans and proper installation shall be verified by the San Leandro Building and <br />Safety Division prior to issuance of a Certificate of Occupancy. <br />Mitigation Measure GHG-1B.: Electrical vehicle Level 2 charging stations shall be provided for the hotel <br />and office land uses for the review and approval of the San Leandro Community Development <br />Director. A minimum of one electric vehicle charging space shall be provided for every 25,000 square <br />feet of non-residential building square footage. The location of the electrical vehicle charging stations <br />P LAC Ew0RKS 4.6-19 <br />GREENHOUSE GAS EMISSIONS <br />TABLE 4.6-5 SAN LEANDRO SHORELINE DEVELOPMENT <br />GHG EMISSIONS FORECAST <br />GHG Emissions (MTCOze/Year) <br />Existing <br />Project <br />Percent <br />Change From <br />Category <br />2014 <br />2020 <br />of Total <br />Existing <br />Construction Emissions <br />Total Construction Emissions <br />NA <br />6,754 <br />NA <br />6,754 <br />30 -Year Amortized Construction <br />NA <br />225 <br />NA <br />225 <br />Operational Emissions <br />Areaa <br /><1 <br />37 <br /><1 <br />37 <br />Energya <br />664 <br />3,060 <br />23 <br />2,396 <br />On -Road Mobile Sourcesa <br />4,298 <br />10,027 <br />74 <br />5,729 <br />Wastea <br />129 <br />355 <br />3 <br />226 <br />Water/Wastewatera <br />11 <br />73 <br />1 <br />61 <br />Boats (Pleasure-Crafts)b39 <br /><1 <br /><1 <br />-39 <br />Total <br />5,141 <br />13,552 <br />100% <br />8,410 <br />Total without Waste` <br />5,013 <br />13,197 <br />— <br />8,184 <br />Service Population (SP)d <br />92 <br />1,973 <br />— <br />1,881 <br />MTCO2e/SP <br />54.5 <br />6.7 <br />BAAQMD Efficiency Threshold <br />— <br />4.6 MTCO2e/SP <br />— <br />— <br />Exceeds BAAQMD Target? — Yes — — <br />Note: Emissions may not total to 100 percent due to rounding. New buildings would be constructed to the 2013 Building & Energy Efficiency Standards <br />(effective July 1, 2014). Assumes all fireplaces are gas -burning fireplaces in accordance with BAAQMD Regulation 6, Rule 3. <br />a. CalEEMod 2013.2.2. Based on year 2014 emission rates. No trip generation is assumed for the 16 live -aboard boat residences. <br />b. Starcrest, 2005. Port of Los Angeles Baseline Air Emissions Inventory. <br />c. BAAQMD did not include solid waste emissions when developing the per capita significance thresholds. Therefore, total GHG emissions with and <br />without the Waste Generation sector are included. If these emissions are included in the analysis for the Project, Project per capita emissions would be <br />6.9 MTCOZe/SP/yr. <br />d. Service population (SP) is based on 16 residents and 76 employees (existing) and 970 residents and 1,003 employees (Project). <br />Impact GHG-1: Implementation of the Project would directly or indirectly generate GHG emissions that <br />may have a significant impact on the environment. <br />Mitigation Measure GHG-1A: Residential developments that include garage parking shall be electrically <br />wired to accommodate electric vehicle charging. The location of the electrical outlets shall be <br />specified on building plans and proper installation shall be verified by the San Leandro Building and <br />Safety Division prior to issuance of a Certificate of Occupancy. <br />Mitigation Measure GHG-1B.: Electrical vehicle Level 2 charging stations shall be provided for the hotel <br />and office land uses for the review and approval of the San Leandro Community Development <br />Director. A minimum of one electric vehicle charging space shall be provided for every 25,000 square <br />feet of non-residential building square footage. The location of the electrical vehicle charging stations <br />P LAC Ew0RKS 4.6-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.