Laserfiche WebLink
SAN LEANDRO SHORELINE DEVELOPMENT DRAFT EIR <br />N/A <br />N/A <br />CITY OF SAN LEANDRO <br />Bay Regional Water Quality Control Board. <br />EXECUTIVE SUMMARY <br />UTIL-5. The Project would not require or result in the LTS <br />N/A <br />TABLE 1-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />construction of new wastewater treatment facilities or <br />Significance <br />Significance <br />would cause significant environmental effects. <br />Before <br />With <br />Significant Impact <br />Mitigation <br />Mitigation Measures <br />Mitigation <br />TRAF-7M: The proposed Project would cause the level of <br />S <br />TRAF-7M: Implement Mitigation Measure TRAF-1D by installing a <br />LTS <br />service at the intersection of Monarch Bay Drive and <br />roundabout at the intersection of Monarch Bay Drive and Mulford <br />provider's existing commitments. <br />Mulford Point Drive (#19) to reduce from LOS A to LOS F <br />Point Drive (#19). <br />N/A <br />in the PM peak hour. <br />and reasonably foreseeable projects would result in less <br />UTILITIES AND SERVICE SYSTEMS <br />wastewater service. <br />UTIL-1. The Project would have sufficient water supplies <br />LTS <br />N/A <br />N/A <br />available to the serve the Project from existing <br />entitlements and resources, and would not require new <br />or expanded entitlements. <br />UTIL-2. The Project would not require or result in the <br />LTS <br />N/A <br />N/A <br />construction of new water facilities or expansion of <br />existing facilities, the construction of which would cause <br />significant environmental effects. <br />UTIL-3. The Project, in combination with past, present, <br />LTS <br />N/A <br />N/A <br />and reasonably foreseeable projects, would result in less <br />than significant cumulative impacts with respect to water <br />service. <br />UTIL-4. Implementation of the Project would not exceed LTS <br />N/A <br />N/A <br />wastewater treatment requirements of the San Francisco <br />Bay Regional Water Quality Control Board. <br />UTIL-5. The Project would not require or result in the LTS <br />N/A <br />N/A <br />construction of new wastewater treatment facilities or <br />expansion of existing facilities, the construction of which <br />would cause significant environmental effects. <br />UTIL-6. The Project would not result in the determination LTS <br />N/A <br />N/A <br />by the wastewater treatment provider, which serves the <br />Project that it does not have adequate capacity to serve <br />the Project's projected demand in addition to the <br />provider's existing commitments. <br />UTIL-7. The Project, in combination with past, present, LTS <br />N/A <br />N/A <br />and reasonably foreseeable projects would result in less <br />than significant cumulative impacts with respect to <br />wastewater service. <br />LTS = Less Than Significant S = Significant SU = Significant Unavoidable Impact <br />1-44 DECEMBER 2014 <br />