My WebLink
|
Help
|
About
|
Sign Out
Home
2A Work Session 2015 0126
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0126
>
2A Work Session 2015 0126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 9:59:45 AM
Creation date
1/21/2015 4:33:09 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/26/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0126 CSAmended+WS
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0126
PowerPoint 2A Work Session 2015 0126 Shoreline DEIR
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0126
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2022
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT DRAFT EIR <br />CITY OF SAN LEANDRO <br />PROJECT DESCRIPTION <br />Stormwater <br />The Project site is connected to the City's storm drain system, and would be required to comply with <br />Provision C.3 of the Municipal Regional Stormwater Permit in order to reduce post -construction <br />stormwater pollutants .Z Compliance with Provision C.3 could include, but not limited to, incorporation of <br />Low Impact Development practices, such as the use of bioswales, infiltration trenches, media filtration <br />devices, pervious surface treatments, and bioretention areas. <br />Water Supply <br />The Project would continue to be provided with water services from the East Bay Municipal Utility District <br />(EBMUD). Although existing infrastructure would be preserved in place where feasible, some <br />infrastructure would potentially be relocated to the public right-of-way. In addition, extensions would be <br />installed to provide water service to structures proposed by the Project. <br />Sanitary Sewer Service <br />The Project site would continue to be provided with sanitary sewer services by the City of San Leandro. As <br />development occurs, extensions would be installed to provide sanitary sewer service to structures <br />proposed by the Project, in addition to the potential relocation of some of the existing infrastructure to <br />accommodate the Project. <br />Utilities <br />Electricity and natural gas would be supplied to the Project site by Pacific Gas & Electric (PG&E). Solid <br />waste generated by the Project would be managed by the City's waste hauler franchisee, which is <br />currently Alameda County Industries. <br />3.4.2 CONSTRUCTION PHASING <br />The anticipated construction phasing (dependent on market forces) for the Project will be as follows: <br />3.4.2.1 GRADING <br />Grading activities would generally occur during Phase 1 and Phase 2. Proposed development occurring on <br />areas of existing surface parking lots (Phase 1 and Phase 3) would occur at one time, and proposed <br />development occurring on the existing golf course (Phase 2) would occur during the start of that phase. <br />3.4.2.2 PHASE 1 <br />200 -room limited -service hotel (inclusive of pool). <br />■ 15,000 -square -foot conference center. <br />z San Francisco Regional Water Quality Control Board (Region 2) Municipal Regional Stormwater Permit (Order No. <br />R2-2009-0074) and NPDES Permit No. CAS612008, as amended by Order No. R2-2011-0083. <br />3-12 DECEMBER 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.