My WebLink
|
Help
|
About
|
Sign Out
Home
8Q Consent 2015 0217
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0217
>
8Q Consent 2015 0217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2015 9:12:24 AM
Creation date
2/11/2015 5:18:19 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/17/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0217 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0217
Reso 2015-032
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: February 17, 2015 <br />aAt� Staff Report <br />File Number: 15-004 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.Q. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Keith Cooke <br />Acting Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for a Resolution Accepting the Work for the Hesperian/Springlake <br />Railroad Crossing Improvements, Project No. 12-150-38-325 <br />SUMMARY AND RECOMMENDATIONS <br />Staff recommends that the City Council accept the work and authorize the City Manager to file <br />the Notice of Completion, release the performance and payment bonds and release the <br />maintenance bond upon successful completion of the one-year maintenance period. <br />BACKGROUND <br />The project improvements include sidewalk construction along Hesperian Boulevard near the <br />railroad crossing, and relocation of the pedestrian crosswalk to south of Springlake Drive. <br />Other associated work consisted of traffic signal modifications, curb ramps and other various <br />improvements in conformance with Americans with Disabilities Act (ADA) requirements and <br />the installation of pedestrian swing gates across the sidewalks approaching the railroad <br />crossing. <br />Analysis <br />Construction is complete. The work was inspected and deemed to comply with the contract <br />documents and City standards. <br />Previous Actions <br />• On July 7, 2014, by Resolution No. 2014-071, the City Council rejected all bids from the <br />first invitation for bids <br />• On September 15, 2014, by Resolution No. 2014-097, the City Council awarded a contract <br />for construction of the work to Columbia Electric, Inc. <br />City of San Leandro Page 1 Printed on 2111/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.