My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2015 0217
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0217
>
10A Action 2015 0217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2015 9:13:18 AM
Creation date
2/23/2015 11:21:11 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/17/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0217 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0217
Reso 2015-034
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
that helped achieve the City's mission of serving the public and enhancing the quality of life in San <br />Leandro. Some of these major initiatives and accomplishments include: <br />Capital Improvements <br />The Village project opened in November 2014. The project's tenants include a Peet's Coffee & Tea, <br />The Habit Burger, AT&T and a CVS, plus an additional one or two tenants. The design concepts <br />include retail and restaurant spaces with outdoor dining, and a public plaza, complete with gathering <br />space and a fountain, a public art component and lush landscaping. Innisfree developed the Village <br />after the City purchased the vacant, blighted property from Albertson's Stores and prepared the site <br />for re -use. <br />Water Pollution Control Plant A $50 million expansion is underway to upgrade the Plant, which was <br />constructed in 1939. Scheduled date of completion is July 2015. <br />Streets and Road Projects As part of the City's overall Pavement Management strategy, the <br />rehabilitation of city streets through the construction of overlay, pothole repairs, and various street <br />resurfacing treatments, continue to improve the streets and roads that enhances the City's road <br />quality and durability. <br />San Leandro Kaiser Medical Center, Phase I The initial phase of development consists of a <br />replacement for the existing Kaiser Permanente Hayward hospital with a new San Leandro Kaiser <br />Medical Center. Phase 1 of the Medical Center opened Spring 2014 and includes a 436,000 square <br />foot, six -story hospital containing up to 264 licensed beds, a 275,000 square foot support building, a <br />central utility plant, and 2,100 surface parking. The state-of-the-art hospital includes ten operating <br />rooms, 24-hour emergency services with forty treatment rooms, and a newborn intensive care <br />nursery. A medical office building contains 116 offices for primary care and specialty <br />physicians, an outpatient procedure suite with six rooms, a pharmacy, a laboratory, and radiology <br />services. This is the largest development project in San Leandro's history. <br />COUNCIL FINANCIAL POLICIES <br />Over the years, the San Leandro City Council has followed a series of Financial Values that provide <br />guidance to budget administration, capital financing and debt management - which are also used to <br />guide the budget process. In addition, the City Council adopted, by resolution, specific budget <br />administration guidelines which set out guidance for fund balance designations and reserves <br />management. <br />The budget administration guidelines recommend sufficient fund balance to provide for: a) <br />Economic uncertainties, local disasters, and other financial hardships or downturns in the local or <br />national economy, b) contingencies for unforeseen operating or capital needs and c) cash flow <br />requirements. Further, the guidelines call for such designated fund balances to be at least 20% of <br />General Fund operating expenditures (budgeted expenditures for the following year). Consequently, <br />based on the General Fund's budgeted operating expenditures for 2014-15 the guideline requirement <br />is approximately $17.3 million. <br />ix <br />
The URL can be used to link to this page
Your browser does not support the video tag.