Laserfiche WebLink
BayCAP2 <br /> ■ Quarterly On-site Maintenance Scope of Work: An ABM technician will visit Site Host locations <br /> in person on a quarterly basis to undertake the following maintenance activities: <br /> o Maintain equipment finishes: ABM will clean the display, head and pedestal/base unit <br /> with ABM Green Care cleanser and microfiber cloth; inspect and clean cord and J-1772 <br /> receptacle,apply cable protective Green Care coating, and clean aluminum and plastic <br /> parts with microfiber cloths and Green Care cleansers. (Note that ABM Green Care <br /> products are LEED certified for green maintenance processes.) <br /> o Activate"ChargePoint" session and perform visual inspection of electrical components <br /> and initiate the charging station self-test processes. Minor repairs and recalibration can <br /> often be done on site while technician is performing service to eliminate return trips <br /> and minimize down time of the equipment. <br /> • ChargePoint warranty repair work: Charging station warranty related repair work will be <br /> processed through ChargePoint if such repairs are the responsibility of the manufacturer. <br /> • Non-Warranty work—option of pre-authorized work: All non-warranty work such as vandalism <br /> repair or damage to EVSE equipment shall be estimated prior to repairs.At the option of the Site <br /> Host,this work could be immediately addressed under a "Not To Exceed"threshold of$750.00 <br /> (or other amount) pre-approved by the site host. If authorized, ABM will perform work on a time <br /> and materials basis.Any agreement for pre-authorized repairs (if so desired)will be executed by <br /> ABM and the Site Host independently of this Authorization to Proceed. <br /> IX. Network Services Fees <br /> The ChargePoint network services fee is$230 per year per port, and covers software upgrades, station <br /> programming, cellular connections,and 24/7 driver support.THE TWO-YEAR NETWORK SERVICES FEE <br /> MUST BE PAID IN FULL PRIOR TO THE COMMISSIONING OF CHARGING STATIONS.ABM will invoice the <br /> Site Host on behalf of ChargePoint, and shall provide proof of Site Host payment within 30 days to the <br /> California EV Alliance in fulfillment of CEC project reporting requirements. <br /> X.ChargePoint One Year Warranty and Optional Extended Warranty <br /> The first year ChargePoint warranty is included free with all charging stations included in the Project.An <br /> optional extended warranty covers one or two additional years(parts only)for$660 per Charging <br /> Station per year. ChargePoint equipment warranty details are provided in Exhibit D of this document. If <br /> a Site Host wishes to extend the ChargePoint warranty, it must be specified at the time of equipment <br /> order and paid within 30 days. <br /> XI. Site Host Pricing Policy Requirements <br /> The California Energy Commission requires Site Hosts to implement a plan to optimize the use of the <br /> charging site to allow multiple EVs to use the charging equipment during a typical day, and to prohibit <br /> utilization of a charging station "beyond a reasonable period of time." In alignment with this goal,the <br /> Site Host shall implement the Pricing Plan identified in their Letter of Participation included in response <br /> to the CEC solicitation PON-13-606.The standard (default) Plan developed for all BayCAP project <br /> participants calls for the following elements to be administered by the Site Host. (Note that variations <br /> from this Plan may be acceptable, but must be approved by the California EV Alliance and included as <br /> part of this Notice to Proceed.) <br /> A. Fee-Based Charging:Site hosts shall set charging rates between $1.00 and $1.50 per hour for <br /> use of the charger.This may or may not include separate charges for parking per the <br /> Bay Area Charge Ahead Project 2-Approval to Proceed I July 30,2014 I page 12 <br />