My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2015 ABM
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2015
>
Agmt 2015 ABM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2015 4:13:57 PM
Creation date
3/2/2015 4:13:55 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/21/2015
Retention
PERM
Document Relationships
Reso 2014-102
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BayCAP2 <br /> Exhibit B: Optional Additional Infrastructure Services Pr <br /> Sample Additional Electrical Upgrade& Installation Infrastructureovided ServicesbyABM <br /> (to be customized by ABM and Site Host) <br /> �y <br /> is i S.n} _ 19` y R <br /> ■ Install Proltect�B�(s) • � r ft <br /> 10 "rl form ' „`' : r, KVA a Concrete t <br /> re <br /> Wail Thr � �� *« Aspa` ut/ �h�=� ,„ <br /> • Floor�eQty Re air <br /> Description of Work to be Performed: <br /> At no additional cost to the City of San Leandro.ABM will: <br /> 1. Provide temporary"No Parking"at installation locations, <br /> 2. Provide and install two#8 conductors(for a total of five#8 conductors)in conduit to each Charge <br /> Station, <br /> 3. Land new conductors in(e)electrical panel, <br /> 4. Extend conduit and conductors from J-box to Charge Station Equipment(at each location),and <br /> 5. Provide(1)ChargePoint"EV Parking Only"sign per station installed,and have agreed to mount the <br /> signage either to a wall or pole at the station location.Reference Exhibit F:ChargePoint EV Parking Only <br /> Signage for example of product. <br /> Materials List: <br /> Materials$: <br /> Labor$: <br /> Tax$: <br /> Total$: <br /> Note:All work performed to local and NEC requirements by California State Certified Electricians. <br /> ABM Electrical Power Services,LLC(ABEPS) Terms and Conditions <br /> The following items are in addition to Section VII—ABM Terms and Conditions within this BayCAP Approval to <br /> Proceed document.Authorization to proceed with the work outlined in this quotation shall constitute Site Host <br /> ("Buyer's")acceptance of these terms and conditions in full. Oral authorizations to proceed must be confirmed to <br /> ABMEPS in writing(Fax,or a mail)within 24 hours. If there is a conflict or discrepancy between terms and <br /> conditions in the Buyers purchase authorization and this quotation,this quotation shall prevail unless specifically <br /> authorized, in writing, by ABM Electrical Power Services, LLC <br /> Terms of Payment: 1.Terms are net thirty(30)days. Any invoice not paid within thirty(30)days from the date of <br /> invoice will be subject to a service charge equal to the lesser of One and One-half percent(1.5%)per month on <br /> account balances or the maximum percentage permitted by law. 2.At ABMEPS's option,customers may be <br /> Bay Area Charge Ahead Project 2-Approval to Proceed I July 30,2014 I page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.