Laserfiche WebLink
BayCAP2 <br /> stops are not included in the standard ABM work scope. If additional protection is desired or <br /> required by the City, bollards or wheel stops can be procured and installed with the city's own <br /> resources or a proposal can be provided by ABM. <br /> VII.ABM Terms and Conditions <br /> A. INDEMNIFICATION. ABM will defend, indemnify and save harmless the Site Host,its officers, <br /> agents and employees from any and all claims,demands,damages,costs,expenses(including <br /> attorney's fees),judgments or liabilities arising out of this Agreement or occasioned by the <br /> performance or attempted performance of the provisions hereof; including, but not limited to,any <br /> act or omission to act on ABM's part,or that of ABM's agents or employees or other independent <br /> contractors directly responsible to ABM, but only to the extent same are caused by the negligence, <br /> misconduct,or fault of ABM,ABM's agents or employees or other independent contractors <br /> directly responsible to ABM. ABM shall notify both the Site Host's Designee and Purchasing <br /> immediately in the event of any accident or injury arising out of or in connection with this <br /> Contract. <br /> B. Contractor Access to Site: The Site Host shall permit ABM ("Contractor"),free and timely access <br /> to areas and equipment,and allow Contractor to start and stop the equipment as necessary to <br /> perform required services.All planned work under this Agreement will be performed during <br /> Contractor's normal working hours. <br /> C. Workmanship&Warranty: Contractor warrants that the workmanship hereunder shall be free <br /> from defects for one year from date of installation. If any replacement part or item of <br /> equipment proves defective,Contractor will extend to Customer the benefits of any warranty <br /> Contractor has received from the manufacturer. Removal and reinstallation of any equipment or <br /> materials repaired or replaced not under a manufacturer's warranty will be at Customer's <br /> expense and at the rates then in effect. <br /> D. Alteration to Scope of Work: Any alteration to, or deviation from,the scope of work in this <br /> Agreement involving extra work, cost of material or labor will become an extra charge (fixed- <br /> price amount or on a time-and-material basis at Contractor's rates then in effect)over the sum <br /> stated in this Agreement. <br /> E. Liability for Delay: Contractor shall not be liable for any delay, loss, damage,or detention <br /> caused by unavailability of machinery, equipment or materials, delay of carriers, strikes, <br /> including those by Contractor's employees, lockouts, civil or military authority, priority <br /> regulations, insurrection or riot,action of the elements,forces of nature,or by any cause <br /> beyond its control. <br /> F. OSHA Provisions: Site Host shall make available to Contractor's personnel all pertinent Material <br /> Safety Data Sheets(MSDS) pursuant to OSHA's Hazard Communication Standard Regulations. <br /> G. Toxic and Hazardous Substances: Site Host's obligation under this proposal; and any <br /> subsequent contract does not include the identification, abatement or removal of asbestos or <br /> any other toxic or hazardous substances, hazardous wastes or hazardous materials. In the event <br /> such substances,wastes,or materials are encountered, Contractor's sole obligation will be to <br /> notify the Site Host of their existence. Contractor shall have the right thereafter to suspend its <br /> work until such substances, wastes,or materials and the resultant hazards are removed.The <br /> time for completion of the work shall be extended to the extent caused by the suspension and <br /> the contract price equitably adjusted. <br /> H. Damage Limitation: UNDER NO CIRCUMSTANCES,WHETHER ARISING IN CONTRACT,TORT <br /> (INCLUDING NEGLIGENCE), EQUITY OR OTHERWISE, WILL CONTRACTOR BE RESPONSIBLE FOR <br /> Bay Area Charge Ahead Project 2-Approval to Proceed I July 30,2014 I page 7 <br />