Laserfiche WebLink
Annual Overlay / Rehabilitation Program <br />•Remove and replace asphalt surfacing on various streets <br />•Estimated Cost: $6.0M/year to maintain status <br />•Funding (2015-16) – $2,340,000 (total) <br />•$1,000,000 Measure HH <br />•$510,000 Measure BB Streets and Roads <br />•$510,000 Measure B Streets & Roads <br />•$320,000 Gas Tax <br />•Funding (2016-17) – $5,965,000 (total) <br />•$3,000,000 Grant (Measure BB project) <br />•$1,000,000 Measure HH <br />•$1,275,000 Measure BB Streets and Roads <br />•$310,000 Measure B Streets & Roads <br />•$380,000 Gas Tax <br />34