My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2015 0420
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0420
>
4A Public Hearing 2015 0420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 8:43:04 AM
Creation date
4/14/2015 3:28:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/20/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0420 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0420
PowerPoint 4A Public Hearing 2015 0420 APL15-0001
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0420
Reso 2015-079
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
TJIs31+t <br />Tratisporiadon <br />Co WAMU <br />Figure 2: Traffic Volumes (in Bar) Using the Interchange <br />Traffic impact fees can only be levied on projects in the areas served by the interchange, in terms of <br />traffic growth from now until 2030. Table III shows how the growth in trips in the four quadrants of <br />the interchange are calculated. Existing trips from these areas must be subtracted from the total <br />a.m. and p.m. peak hour 2030 trips to and from the interchange. The objective is to determine what <br />percentage of trips in the four quadrants of the interchange use the interchange versus all other <br />locations. Table III provides the detailed data for this calculation. <br />Table 111: Calculation of Trip Growth. 2005 to 2030 and Proportion of Interchange Trips <br />Year <br />Trip Categories <br />Total Trips A Trips <br />Trips to/from Project Trips <br />a.m. + P.M. 2005 -) 2030 <br />ICI and Kaiser fn Quadra1,1-4 <br />2005 <br />Project Trips Using Interchange <br />All Trips Using Interchange <br />6,914 20 <br />7,924 <br />23,512 20 <br />Quadrant Trips to/from All Locations <br />2030 <br />Project Trips Using Interchange <br />All Trips Using Interchange <br />11,956 5,042 3732 1,310 <br />14,814 6,890 <br />Quadrant Trips to/from All Locations <br />36,704 13,192 6894 6,298 <br />Notes: Project Trips = Trips from Quadrants I - 4 using Marinall-880 Interchange (excludes Kaiserm-i) <br />All Trips = All traffic using interchange including Project Trips (includes Kaiser/ICI) <br />Quadrant Trips = Trips to/from Quadrants I - 4 to all locations <br />Page 9 <br />Final Report — Traffic Impact Fee Analysis for 1-880/Marina Interchange Improvement November 12, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.