My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2015 0420
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0420
>
4A Public Hearing 2015 0420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 8:43:04 AM
Creation date
4/14/2015 3:28:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/20/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0420 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0420
PowerPoint 4A Public Hearing 2015 0420 APL15-0001
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0420
Reso 2015-079
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
VIII. PUBLIC WORKS <br />A. All proposed tenant improvements moving into the building shall be subject to a <br />building permit that shall be subject to the review of the Public Works Water Pollution <br />Control Plant. (Note: The sewer main on Williams Street is a six-inch line.). Any <br />proposed processing facility in the future in the new building shall be submitted in <br />writing to the City's Public Works Water Pollution Control Plant to analyze if capacity <br />is adequate or it will be required to be enlarged to increase its capacity. <br />B. The storm water system shall be designed to include trash capture, not only on the <br />property, but also on the street if possible. Details shall be subject to the review and <br />approval of the Public Works Director or designee at the City's Water Pollution Control <br />Plant. <br />IX. CONSTRUCTION PROVISIONS <br />A. Pest and vermin control shall be instituted prior to the demolition and construction of <br />the project. <br />B. During construction the following high standards for sanitation are required: Garbage <br />cans, construction dumpsters, and debris piles shall be removed on a minimum weekly <br />basis. All food related trash items such as wrappers, cans, bottles, and food scraps shall be <br />disposed of in closed containers only and shall be regularly removed from the site. At no <br />time shall debris remain on site unattended within the front yard setback of the property. <br />Inspections will be conducted as part of the regular construction compliance, to ensure <br />compliance of the Applicant and contractors with this requirement. <br />C. Construction activity shall not commence prior to 7:00 a.m. and shall cease by 7:00 p.m. <br />Monday through Friday, and construction activity shall not commence prior to 9:00 a.m. <br />and shall cease by 5:00 p.m. on Saturday. No construction is permitted on Federal <br />holidays or Sundays. As provided in the City of San Leandro's Noise Ordinance <br />(ORDINANCE NO. 2003-005), "construction" shall mean any site preparation, <br />assembly, erection, substantial repair, alteration, demolition or similar action, for or on <br />any private property, public or private right-of-way, streets, structures, utilities, facilities, <br />or other similar property. Construction activities carried on in violation of this Article may <br />be enforced as provided in Section 4-11-1130, and may also be enforced by issuance of a <br />stop work order and/or revocation of any or all permits issued for such construction <br />activity. Procedures with the highest noise potential shall be scheduled for daylight <br />hours, when ambient noise levels are highest. The contractor(s) shall be required to <br />employ the quietest among alternative equipment or to muffle/control noise from <br />available equipment. <br />D. Construction activity shall not create dust, noise or safety hazards for adjacent residents <br />and properties. Dirt and mud shall not be tracked onto Williams Street, Aurora Drive, <br />Polvorosa Avenue, or Doolittle Drive from the project site during construction. <br />Standard construction dust control procedures, such as wetting, daily roadwashing and <br />other maintenance functions to control emissions, shall be implemented at all times <br />during outdoor construction. Dust generating activities such as excavation, paving etc., <br />shall be scheduled in the early morning and other hours when wind speeds are low. All <br />PLN2014-00028 Page 8 of 9 <br />Conditions of Approval February 5, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.