Laserfiche WebLink
UNIT <br />ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT <br />1 Mobilization 1 LS $15,000.00 $15,000.00 <br />2 Traffic Control 1 LS $6,000.00 $6,000.00 <br />3 Clear and Grub incl concrete, AC, and sawcut 1 LS $60,000.00 $60,000.00 <br />4 AC pavement (no demo)538 ton $200.00 $107,600.00 <br />5 Fog seal at removed striping 1 LS $8,000.00 $8,000.00 <br />6 Adjust utility boxes to grade 8 EA $200.00 $1,600.00 <br />7 12" SD pipe 194 LF $220.00 $42,680.00 <br />8 New LP fdn and relocate E poles, wired 2 EA $4,000.00 $8,000.00 <br />9 R&R striping 1 LS $8,000.00 $8,000.00 <br />10 Duratherm AC imprint 4,430 SF $3.00 $13,290.00 <br />11 sidewalk incl AB (no demo)7,566 SF $11.00 $83,226.00 <br />12 curb and gutter (w/o2' AC tie in and no demo)652 LF $45.00 $29,340.00 <br />13 commercial driveway incl AB (no demo)60 SF $13.00 $780.00 <br />14 ADA ramps incl AB (no demo)1,369 SF $13.00 $17,797.00 <br />15 New sign poles and reinstall E signs 6 EA $300.00 $1,800.00 <br />16 Curb inlet 8 EA $3,500.00 $28,000.00 <br />17 Furnish and install tree grate 1 EA $2,500.00 $2,500.00 <br />18 County SDMH 6 EA $6,000.00 $36,000.00 <br />19 Pothole utilities 3 EA $800.00 $2,400.00 <br />20 Trash Capture Screens 8 EA $600.00 $4,800.00 <br />21 Sheeting, Shoring, and Bracing 1 LS $2,000.00 $2,000.00 <br />22 Temporary Pedestrian facilities at Carpentier 1 LS $15,000.00 $15,000.00 <br />23 Furnish and install street lights 6 EA $8,000.00 $48,000.00 <br />SUBTOTAL CONSTRUCTION $541,813.00 <br />ENGINEER'S COST OPINION <br />FOR <br />West Juana Pedestrian Improvements <br />Project Number 2014.0500