BID SUMMARY
<br />PROJECT TITLE: Sanitary Sewer Line Replacement/Repair 2012-13
<br />PROJECT NO.: 2013.0120
<br />BID NO.: 14-15.025
<br />BID OPENING
<br />DATE: Monday, March 23, 2015
<br />TIME: 3:00 p.m.
<br />LOCATION: City Clerk's Office
<br />ENGINEER'S ESTIMATE
<br />Date Approved: 2/25/2015
<br />Prepared by: Kyle Lei
<br />Con -Quest Contractors, Inc.
<br />1700 Neptune Drive
<br />San Leandro, CA 94577
<br />Phone: (510) 957-1845
<br />Fax: (510) 957-1870
<br />Ranger Pipelines Incorporated
<br />P.O. Box 24109
<br />San Francisco, CA 94124
<br />Phone: (415) 822-3700
<br />Fax: (415) 822-3703
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />39
<br />NOT USED
<br />0 EA
<br />$1,200.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />40
<br />Replace Manhole Frame & Cover with
<br />7 EA
<br />$1,200.00
<br />$8,400.00
<br />$1,100.00
<br />$7,700.00
<br />$800.00
<br />$5,600.00
<br />City -Furnished Composite Manhole
<br />Frame & Cover
<br />41
<br />4'x 5' Vault Cover and Frame
<br />1 EA
<br />$3,000.00
<br />$3,000.00
<br />$4,400.00
<br />$4,400.00
<br />$6,500.00
<br />$6,500.00
<br />42
<br />4'x T Vault Cover and Frame
<br />3 EA
<br />$3,500.00
<br />$10,500.00
<br />$5,000.00
<br />$15,000.00
<br />$7,000.00
<br />$21,000.00
<br />43
<br />Re -channel Sanitary Sewer Manhole
<br />2 EA
<br />$1,600.00
<br />$3,200.00
<br />$1,500.00
<br />$3,000.00
<br />$800.00
<br />$1,600.00
<br />44
<br />Abandon SDMH per Sheet 9
<br />1 LS
<br />$2,500.00
<br />$2,500..00
<br />$3,500.00
<br />$3,500.00
<br />$1,500.00
<br />$1,500.00
<br />45
<br />Sanitary Sewer Crossing per City
<br />2 EA
<br />$1,500.00
<br />$3,000.00
<br />$400.00
<br />$800.00
<br />$1,500.00
<br />$3,000.00
<br />Standard Plan No. 304
<br />46
<br />6 -inch HMA Resurfacing per City
<br />1894 SF
<br />$16.00
<br />$30,304.00
<br />$14.00
<br />$26,516.00
<br />$7.50
<br />$14,205.00
<br />Standard Plan No. 122C
<br />47
<br />9 -inch HMA Resurfacing per City
<br />1398 SF
<br />$19.00
<br />$26,562.00
<br />$17.00
<br />$23,766.00
<br />$11.00
<br />$15,378.00
<br />Standard Plan No. 122C
<br />48
<br />12 -inch HMA Resurfacing per City
<br />92 SF
<br />$23.00
<br />$2,116.00
<br />$24.00
<br />$2,208.00
<br />$15.00
<br />$1,380.00
<br />Standard Plan No. 122C
<br />-
<br />49
<br />Curb and Gutter per City Standard
<br />6 LF
<br />$80.00
<br />$480.00
<br />$75.00
<br />$450.00
<br />$65.00
<br />$390.00
<br />Plan No. 100
<br />50
<br />Sidewalk per City Standard Plan No.
<br />56 SF
<br />$18.00
<br />$1,008.00
<br />$15.00
<br />$840.00
<br />$18.00
<br />$1,008.00
<br />100
<br />51
<br />6" Residential Driveway per City
<br />130 SF
<br />$33.00
<br />$4,290.00.
<br />$25.00
<br />$3,250.00
<br />$45.00
<br />$5,850.00
<br />Standard Plan No. 102
<br />52
<br />Landscape Removal and Restoration
<br />140 SF
<br />$20.00
<br />$2,800.00
<br />$15.00
<br />$2,100.00
<br />$5.00
<br />$700.00
<br />53
<br />Sheeting, Shoring and Bracing
<br />1 LS
<br />$22,500.00
<br />$22,500.00
<br />$55,000.00
<br />$55,000.00
<br />$50,000.00
<br />$50,000.00
<br />54
<br />12 -inch Class I RCP Installation with
<br />1 LS
<br />$20,000.00
<br />$20,000.00
<br />$5,000.00
<br />$5,000.00
<br />$25,000.00
<br />$25,000.00
<br />Pipe Anchor per Sheet 10
<br />55
<br />M4-9aL and M4-9aR Signs per Sheet
<br />1 LS
<br />$600.00
<br />$600.00
<br />$400.00
<br />$400.00
<br />$1,000.00
<br />$1,000.00
<br />10
<br />56
<br />Raise Two City Manhole Frame and
<br />1 LS
<br />$2,000.00
<br />$2,000.00
<br />$3,750.00
<br />$3,750.00
<br />$2,500.00
<br />$2,500.00
<br />Covers Listed on Appendix A to
<br />Adjacent Grade per City Standard Plan
<br />No. 222
<br />Sanitary Sewer Line Replacement - Repair 2012-13 Page 3 of 6 Printed 3/24/2015 @ 8:10 AM