My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2015 0420
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0420
>
8E Consent 2015 0420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:16:20 AM
Creation date
4/14/2015 4:22:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/20/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0420 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0420
Reso 2015-083
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
BID SUMMARY <br />PROJECT TITLE: Sanitary Sewer Line Replacement/Repair 2012-13 <br />PROJECT NO.: 2013.0120 <br />BID NO.: 14-15.025 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Con -Quest Contractors, Inc. <br />Ranger Pipelines Incorporated <br />DATE: Monday, March 23, 2015 <br />Date Approved: <br />2/25/2015 <br />1700 Neptune Drive <br />P.O. Box 24109 <br />TIME: 3:00 p.m. <br />Prepared by: <br />Kyle Lei <br />San Leandro, CA 94577 <br />San Francisco, CA 94124 <br />LOCATION: City Clerk's Office <br />Phone: (510) 957-1845 <br />Phone: (415) 822-3700 <br />Fax: (510) 957-1870. <br />Fax: (415) 822-3703 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />A52 <br />NOT USED <br />0 SF <br />$20.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />A53 <br />Sheeting, Shoring and Bracing <br />1 LS <br />$7,500.00 <br />$7,500.00 <br />$10,000.00 <br />$10,000.00 <br />$15,000.00 <br />$15,000.00 <br />A54 <br />NOT USED <br />0 EA <br />$81.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />TOTAL ADDITIVE BID ITEM A: <br />$188,609.00 <br />$269,721.00 <br />$311,595.00 <br />TOTAL BASE BID: <br />$642,347.50 <br />$844,589.00 <br />$940,271.00 <br />ADJUSTMENT FOR LOCAL INCLUSION POLICY: <br />($50,000.00) <br />$0.00 <br />ADJUSTED BASE BID FOR BASIS OF AWARD: <br />$794,589.00 <br />$940,271.00 <br />TOTAL BASE BID + ADDITIVE BID ITEM A: <br />$830,956.50 <br />$1,114,310.00 <br />$1,251,866.00 <br />SUBCONTRACTORS: <br />None <br />None <br />SECURITIES: <br />10% Bid Bond <br />10% Bid Bond <br />NOTES: <br />Reviewed by: '0 lz Date: <br />Ky a Lei, Project Manager <br />Reviewed by: ADate: <br />Ni k Thom, Acting City Engineer <br />31z -et 4s <br />Sanitary Sewer Line Replacement - Repair 2012-13 Page 6 of 6 Printed 3/24/2015 @ 8:10 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.