Laserfiche WebLink
Current Fee Proposed FeeReferenceDescription Proposed Fee Explanations <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />3 Electrical Permit (Continued) <br />Service disconnecting means for additional meter $5.55 up to a maximum of $84.40 each <br />Fixed Residential Appliances (connection on new or existing circuits): <br />Electric range, dryer, combination washer and dryer, furnace, water <br />heater, etc., each <br />$10.80 $11.10 CPI of 2.8% applied for electrical permit fees <br />Heaters (air, water and other kinds), furnaces and welding machines: <br />For each DW or kVA and fraction of either. <br />Up to and including 20kW or kVA $22.90 $23.50 <br />Over 20kW or kVA to and including 50kW or kVA $56.40 $58.00 <br />Over 50kW or kVA to and including 80 kW or kVA $90.30 $92.80 <br />Over 80kW or kVA $111.40 $114.50 <br />Medical/dental equipment, food cabinets, show cases, laundry machines, <br />motion picture machines, specialty lighting, etc.) <br />$10.90 <br />$11 <br />Fire protection systems, other than smoke detectors $15.80 $16 <br />Smoke detectors $4.70 $5 <br />Motors, including starting and controlling apparatus therefore and wiring between same and motor: <br />Up to and including 1 h.p.$4.60 $5 <br />1.1 h.p. to 10 h.p.$10.90 $11 <br />10.1 h.p. to 13 h.p.$34.40 $35 <br />13.1 h.p. to 16 h.p.$42.10 $43 <br />16.1 h.p. to 19 h.p.$50.60 $52 <br />19.1 h.p. to 22 h.p.$58.20 $60 <br />22.1 h.p. to 25 h.p.$66.00 $68 <br />25.1 h.p. to 28 h.p.$73.90 $76 <br />28.1 h.p. to 31 h.p.$81.80 $84 <br />31.1 h.p. to 34 h.p.$90.00 $93 <br />Above 34 h.p.$90.50 $93 <br />For changes, renewals or replacement of said apparatus, where no changes in <br />wiring are necessary <br />One-half (1/2) of the amount set forth above <br />For motor generator sets, balancer sets, dynamotors and converters, including <br />control apparatus <br />$93 <br /> <br />1 to 20 $22.10 $22.70 <br />21 to 50 $57.10 $58.78 <br />51 to 80 $87.00 $89.40 <br />81 and above $100.00 $102.80 <br />For inspection of alterations and changes in existing wiring, each inspection visit $30.70 $31.60 <br />Photovoltaic Fees do not include Issuing and Filing Fees, Automation fees, and other mandated fees <br />Photovoltaic - Residential $62 <br />Photovoltaic - Commercial/Industrial 0 to 8kw $256.00 (includes 1hr. structural plan check, 1 hr. electrical plan check, and 1 inverter)$263 <br />Photovoltaic - Commercial/Industrial >8 to 48kw $368 <br />Photovoltaic - Commercial/Industrial >48kw $735 <br />Each 0 - 8kw P.V. Inverter over 1 $22.50 $23.10 <br />Each >8 - 48kw P.V. Inverter over 1 $53.10 $54.60 <br />Each >48kw P.V. Inverter over 1 $85.80 $88.20 <br />Energy Conservation: review of plans and/or energy forms for all buildings <br />subject to the California Energy Commission’s conservation regulations (when <br />not covered by building permit) <br />Direct Cost (1) with a minimum charge of $62.00 $64 <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />150% of fees set forth above, with a maximum for one <br />such machine of $90.00 <br />Replace $90 with $93 in text. <br />Transformers and balance coils, when not embodied in or included with apparatus for which fee is herein specifically prescribed, <br />Generators, and Rectifiers (mercury arc, vibrating and electrolytic) rated for each rated kVA and fraction thereof: <br />$60.00 (includes over-the-counter plan check, 1 inverter, 1 disconnect, and <br />circuit connection to main panel) <br />$715.00 (includes 4 hrs. structural plan check, 1 hr. electrical plan check, and <br />1 inverter) <br />Replace $715 with $735 in text <br />Replace $62 with $64 in text <br />$358.00 (includes 1-1/2hr. structural plan check, 1 hr. electrical plan check, <br />and 1 inverter ) <br />Replace $22.90 with $23.50 <br />Replace $56.40 with $58 <br />Replace $90.30 with $92.80 <br />Replace $60 with $62 in text <br />Replace $256 with $263 in text <br />Replace $358 with $368 in text <br />$87.00 Replace $84.40 with $87. See revised text in blue. <br />Replace $111.40 with $114.50 <br />Fixed commercial appliances (connection on new or existing circuits) not exceeding 1HP, kW or kVA: <br /> 6