Laserfiche WebLink
Current Fee Proposed FeeReferenceDescription Proposed Fee Explanations <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />5 Heating, Ventilating and Air Condition or General Mechanical (Continued) <br />Fans or blowers connected to any heating system which are not part of the <br />furnace, each <br />$9.30 $9.60 <br />Commercial range hoods, including vent, each $35.00 $36.00 <br />Flues: <br />Minimum (one or two flues)$10.90 $11.20 <br />Each flue over two (each)$6.70 $6.90 <br />Ventilating System for Kitchen, Bath, etc.: <br />Minimum (one or two systems)$10.90 $11.20 <br />Each system over two $9.30 $9.60 <br />General Mechanical: <br />Incinerators – domestic, each $15.80 $16.20 <br />Incinerators – commercial/industrial, each $61.90 $63.60 <br />Garbage chutes, each $20.30 $20.90 <br />Fire dampers, each $9.30 $9.60 <br />Smog control after burners, commercial/industrial, each system $42.10 $43.30 <br />Refrigeration system – commercial/industrial, each system $53.80 $55.30 <br />Condensate drain system, each inlet $4.10 $4.20 <br />Boilers: <br />All sizes $75.00 $77.10 <br />Heat pumps, each $24.20 $24.90 <br />Cooling Systems: <br />To 100,000 BTU each $21.30 $21.90 <br />Over 100,000 to 500,000 BTU, each $33.60 $34.50 <br />Over 500,000 to 1,000,000 BTU, each $44.40 $45.60 <br />Over 1,000,000 BTU, each $55.10 $56.60 <br />Evaporative Cooler, each $22.20 $22.80 <br />Industrial Processing Equipment: <br />Ovens, dryers, cookers, fryers, kettles, etc. each $35.00 $36.00 <br />Industrial processing exhaust systems, each system $35.00 $36.00 <br />Manufactured spray booths, each $35.00 $36.00 <br />Energy Conservation: review of plans and/or energy forms for all buildings <br />subject to the California Energy Commission’s conservation regulations (when <br />not covered by building permit) <br />Direct Cost (1) with a minimum charge of $62.00 $64 Replace $62 with $64 in text <br />6 Signs <br />Filing and Issuance Fee $97 Replace $94 with $97 in text <br />1 to 2 signs (non electric, attached to building)$150.00 $154 CPI 2.8% <br />3 to 4 signs (non electric, attached to building)$225.00 $231 CPI 2.8% <br />5 plus signs (non electric, attached to building)$300.00 $308 CPI 2.8% <br />Monument signs (each)$200.00 $206 CPI 2.8% <br />Electric self-contained signs, initially installed bearing Underwriters’ label of <br />approval, each <br />$28.60 $29.00 CPI 2.8% <br />Relocation or alteration of any sign electronically or mechanically, but not <br />including replacement of tubing, transformers and such parts subject to <br />failure; or shop inspection by the local inspection department in lieu of a UL <br />label (a local electrical inspection department label of approval shall be <br />required), each <br />$75.00 $77.00 CPI 2.8% <br />7 Excavation and Grading <br />Minimum Fee $73 Replace$71 with $73 in text <br />Plan Checking $73 Replace$71 with $73 in text <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />$94.00 plus fees shown below. Fees for sign permits are in addition to any <br />required electrical permit fees <br />Sign permit fees are flat rate as indicated below and based on all signs being on the same property and on the same <br />permit. Rates include review and inspection <br />$71.00 PLUS the fees shown in the fee schedule as adopted by the City <br />Council except that wherever an hourly rate is shown, the rate shall be <br />equal to the Direct Cost (1) or whichever is greater. <br />$71.00 PLUS the fees shown in the fee schedule as adopted by the City <br />Council except that wherever an hourly rate is shown, the rate shall be <br />equal to the Direct Cost (1) or whichever is greater. <br /> 9