Current Fee Proposed FeeReferenceDescription Proposed Fee Explanations
<br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division
<br />1 Plans and Specifications See Engineering & Transportation Department Item 7, Public Work Projects
<br />2 Building Permit
<br />A. Filing and Issuance Fee $94 plus valuation fees and/ or other
<br />building fees as listed below
<br />$97 Replace $94 with $97 in text.
<br />Re-filing Fee for each resubmittal, deferred submittal, and/or revision after
<br />1st resubmittal, or upon 2nd resubmittal for plan check on same project
<br />50% of Filing and Issuance Fee per
<br />occurrence
<br />Minimum fee for one inspection Included in the Issue and Filing Fee
<br />Building Permits requiring more than one inspection, other than for those
<br />requiring return inspections for corrections from a previous inspection, have
<br />a minimum fee of:
<br />$143.00 $147 CPI 2.8% applied for building permit fees
<br />All-Inclusive Permit: Work involving a combination of building and/or
<br />mechanical, electrical and plumbing, with a value of less than $3,000:
<br />One filing and issuance fee plus Items from
<br />respective fee tables
<br />Residential Seismic Retrofit projects using "Plan set A" (for one and two
<br />family residences)
<br />$75.00 plus Filing and Issuance Fee and
<br />other miscellaneous fees
<br />
<br />
<br />
<br />Permits involving plan check, inspections, and verification per OSHPD3
<br />requirements.
<br />
<br />New Commercial/Industrial Buildings 10,000 sq. ft. or more (additional time
<br />for plan review, inspections, and verification of code requirements)
<br />125% of standard Building Permit Fee
<br />Tier 1 Certification (additional time for plan review, inspections, and
<br />verification of code requirements)
<br />130% of standard Building Permit Fee
<br />Tier 2 Certification (additional time for plan review, inspections, and
<br />verification of code requirements)
<br />135% of standard Building Permit Fee
<br />(Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent with this fee schedule.)
<br />From - To and Including
<br />$1.00 - $4,000 $147
<br />$4,001.00-$50,000.00 $147 Replace $143 and $14.20 with $147 and $14.60 in text.
<br />$50,001.00-$100,000.00 $818 Replace $796 and $10 with $818 and $10.30 in text.
<br />$100,001.00-$500,000.00 $1,330 Replace $1294 and $5.70 with $1330 and $5.90 in text.
<br />$500,001.00-$1,000,000.00 $4,041 Replace $3931 and $5.40 with $4041 and $5.60 in text.
<br />$1,000,001.00 and up $6,415 Replace $6240 and $4.50 with $6415 and $4.60 in text.
<br />B. Termite Repair Work $97 Replace $94 with $97 in text.
<br />$0.00 - $3,000 $4,000 $147 See revised text in blue.
<br />Over $3,000 Over $4,000 $147 Replace $143 with $147 in text. See revised text in blue.
<br />C. Residential 1 and 2 Family Re-roof
<br />Main dwelling roof $242 Replace $235 with $242 in text.
<br />Detached garages and accessory structures on same property as main
<br />dwelling and done at the same time as the main dwelling roof.
<br />$77
<br />D. Satellite Dish Antenna $144
<br />E. Minor Kitchen and/or Bath Remodel Permit: Limited to work without
<br />framing changes
<br />$373 Replace $363 with $373 in text.
<br />(Limited to work without framing changes.)$154 Replace $150 with $154 in text. See revised text in blue.
<br />NOTE: FEES FOR BUILDING PERMITS AND TERMITE REPAIR WORK DO NOT INCLUDE THE STRONG MOTION (EARTHQUAKE) INSTRUMENTATION PROGRAM (S.M.I.P.) FEE MANDATED BY THE STATE OF CALIFORNIA
<br />AND COLLECTED BY THE CITY FOR THE STATE. THIS FEE MUST BE ADDED TO THE PERMIT FEES.
<br />125% of normal Building Permit Fee. Plan check fee
<br />shall be calculated based on this increased fee.
<br />Total Valuation: (Based on total value of all construction work, as determined by the Building Official, including all finish work, roofing,
<br />electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment.)
<br />$143.00
<br />$6,240.00 for the first $1,000,000 plus $4.50 for each additional $1,000 or
<br />fraction thereof, over $1,000,000
<br />$143.00 for the first $4,000.00 plus $14.20 for each additional $1,000 or
<br />fraction thereof, to and including $50,000
<br />$796.00 for the first $50,000 plus $10.00 for each additional $1,000 or fraction
<br />thereof, to and including $100,000.00
<br />$1,294.00 for the first $100,000 plus $5.70 for each additional $1,000 or
<br />fraction thereof, to and including $500,000.00
<br />$3,931.00 for the first $500,000 plus $5.40 for each additional $1,000 or
<br />fraction thereof, to and including $1,000,000.00
<br />a.Single kitchen or bath remodel (permit to include electrical, plumbing,
<br />mechanical ventilation and appliances) $363.00
<br />Same as for other building permits, minimum of $143.00
<br />$140.00
<br />b. Additional bath remodel when concurrent with kitchen or bath remodel
<br />within the same structure and at same time $150.00
<br />$94.00 plus total valuation as listed above
<br />$143.00
<br />$235.00 all sizes and materials
<br />$75.00
<br /> 4
|