Laserfiche WebLink
Current Fee Proposed FeeReferenceDescription Proposed Fee Explanations <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division <br />1 Plans and Specifications See Engineering & Transportation Department Item 7, Public Work Projects <br />2 Building Permit <br />A. Filing and Issuance Fee $94 plus valuation fees and/ or other <br />building fees as listed below <br />$97 Replace $94 with $97 in text. <br />Re-filing Fee for each resubmittal, deferred submittal, and/or revision after <br />1st resubmittal, or upon 2nd resubmittal for plan check on same project <br />50% of Filing and Issuance Fee per <br />occurrence <br />Minimum fee for one inspection Included in the Issue and Filing Fee <br />Building Permits requiring more than one inspection, other than for those <br />requiring return inspections for corrections from a previous inspection, have <br />a minimum fee of: <br />$143.00 $147 CPI 2.8% applied for building permit fees <br />All-Inclusive Permit: Work involving a combination of building and/or <br />mechanical, electrical and plumbing, with a value of less than $3,000: <br />One filing and issuance fee plus Items from <br />respective fee tables <br />Residential Seismic Retrofit projects using "Plan set A" (for one and two <br />family residences) <br />$75.00 plus Filing and Issuance Fee and <br />other miscellaneous fees <br /> <br /> <br /> <br />Permits involving plan check, inspections, and verification per OSHPD3 <br />requirements. <br /> <br />New Commercial/Industrial Buildings 10,000 sq. ft. or more (additional time <br />for plan review, inspections, and verification of code requirements) <br />125% of standard Building Permit Fee <br />Tier 1 Certification (additional time for plan review, inspections, and <br />verification of code requirements) <br />130% of standard Building Permit Fee <br />Tier 2 Certification (additional time for plan review, inspections, and <br />verification of code requirements) <br />135% of standard Building Permit Fee <br />(Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent with this fee schedule.) <br />From - To and Including <br />$1.00 - $4,000 $147 <br />$4,001.00-$50,000.00 $147 Replace $143 and $14.20 with $147 and $14.60 in text. <br />$50,001.00-$100,000.00 $818 Replace $796 and $10 with $818 and $10.30 in text. <br />$100,001.00-$500,000.00 $1,330 Replace $1294 and $5.70 with $1330 and $5.90 in text. <br />$500,001.00-$1,000,000.00 $4,041 Replace $3931 and $5.40 with $4041 and $5.60 in text. <br />$1,000,001.00 and up $6,415 Replace $6240 and $4.50 with $6415 and $4.60 in text. <br />B. Termite Repair Work $97 Replace $94 with $97 in text. <br />$0.00 - $3,000 $4,000 $147 See revised text in blue. <br />Over $3,000 Over $4,000 $147 Replace $143 with $147 in text. See revised text in blue. <br />C. Residential 1 and 2 Family Re-roof <br />Main dwelling roof $242 Replace $235 with $242 in text. <br />Detached garages and accessory structures on same property as main <br />dwelling and done at the same time as the main dwelling roof. <br />$77 <br />D. Satellite Dish Antenna $144 <br />E. Minor Kitchen and/or Bath Remodel Permit: Limited to work without <br />framing changes <br />$373 Replace $363 with $373 in text. <br />(Limited to work without framing changes.)$154 Replace $150 with $154 in text. See revised text in blue. <br />NOTE: FEES FOR BUILDING PERMITS AND TERMITE REPAIR WORK DO NOT INCLUDE THE STRONG MOTION (EARTHQUAKE) INSTRUMENTATION PROGRAM (S.M.I.P.) FEE MANDATED BY THE STATE OF CALIFORNIA <br />AND COLLECTED BY THE CITY FOR THE STATE. THIS FEE MUST BE ADDED TO THE PERMIT FEES. <br />125% of normal Building Permit Fee. Plan check fee <br />shall be calculated based on this increased fee. <br />Total Valuation: (Based on total value of all construction work, as determined by the Building Official, including all finish work, roofing, <br />electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment.) <br />$143.00 <br />$6,240.00 for the first $1,000,000 plus $4.50 for each additional $1,000 or <br />fraction thereof, over $1,000,000 <br />$143.00 for the first $4,000.00 plus $14.20 for each additional $1,000 or <br />fraction thereof, to and including $50,000 <br />$796.00 for the first $50,000 plus $10.00 for each additional $1,000 or fraction <br />thereof, to and including $100,000.00 <br />$1,294.00 for the first $100,000 plus $5.70 for each additional $1,000 or <br />fraction thereof, to and including $500,000.00 <br />$3,931.00 for the first $500,000 plus $5.40 for each additional $1,000 or <br />fraction thereof, to and including $1,000,000.00 <br />a.Single kitchen or bath remodel (permit to include electrical, plumbing, <br />mechanical ventilation and appliances) $363.00 <br />Same as for other building permits, minimum of $143.00 <br />$140.00 <br />b. Additional bath remodel when concurrent with kitchen or bath remodel <br />within the same structure and at same time $150.00 <br />$94.00 plus total valuation as listed above <br />$143.00 <br />$235.00 all sizes and materials <br />$75.00 <br /> 4