Laserfiche WebLink
Projects fully funded without GF <br />Estimated <br />Project <br />Project Name <br />Cost <br />Council <br />CM <br />Number <br />Rank <br />Rank <br />Sources of funding <br />Annual Street Sealing <br />20xx.007 <br />1,500,000 <br />2 <br />7 <br />Meas B LSR and VRF <br />Annual Sanitary Sewer <br />Replacement/Repair <br />20xx.012 <br />500,000 <br />13 <br />1 <br />WPCP Enterprise <br />Davis St San Sewer Manhole & Pipe <br />Rehab <br />2016.0510 <br />520,000 <br />14 <br />2 <br />WPCP Enterprise <br />Annual Traffic Studies & Signal <br />Equipment <br />20xx.008 <br />20,000 <br />16 <br />31 <br />DFSI <br />Annual Sidewalk Repair <br />20xx.006 <br />600,000 <br />19 <br />50 <br />Meas B B&P, LSR and TDA <br />Adaptive Traffic Control Signal System <br />Upgrade <br />2014.0460 <br />500,000 <br />23 <br />37 <br />DFSI <br />Annual Bike & Ped Improvements <br />20xx.003 <br />50,000 <br />37 <br />56 <br />Meas B B&P <br />East 14th St Underground Utility Ph <br />0982 <br />2.1 <br />1,686,000 <br />44 <br />12 <br />UG Utility in lieu fee <br />