Laserfiche WebLink
Item <br />1 <br />Project Number <br />20xx.005 <br />Project Name <br />Annual Overlay/Rehabilitation <br />Estimated GF Cost <br />$ 1,000,000 <br />2 <br />2012.0132 <br />Marina Blvd Streetscape Improvements — Merced to Doolittle Dr <br />3 <br />2016.0500 <br />Marina Community Center Audio Video System <br />$ <br />300,000 <br />4 <br />2014.0481 <br />Police Bldg & South Office Modifications <br />$ <br />6,400,000 <br />5 <br />2012.0130 <br />Marina Blvd. Streetscape Improvements, Conceptual Design <br />$ <br />542,000 <br />6 <br />20xx.002 <br />Annual ADA Transition Plan Construction <br />$ <br />33,017 <br />7 <br />2016.0350 <br />Downtown Smart City System with Parking Meter System and Wi-Fi Network <br />8 <br />2012.0131 <br />Marina Blvd Streetscape Improvements — Doolittle to Monarch Bay Dr. <br />9 <br />10 <br />11 <br />2016.0210 <br />20xx.011 <br />2012.0120 <br />Main Library - Audio Visual Equipment <br />Annual PWS Maintenance Projects <br />East 14th St. South Area Pedestrian Improvements —136th Avenue to Southern City Limit <br />$ <br />$ <br />$ <br />270,000 <br />100,000 <br />379,000 <br />12 <br />20xx.014 <br />Annual Sidewalk Repair Program - City Properties <br />$ <br />50,000 <br />13 <br />2016.0420 <br />Bike and Ped Improvements BART to Bayfair <br />$ <br />460,000 <br />15 <br />2005.0050 <br />Siempre Verde Park Playground/Picnic Renovation <br />$ <br />690,000 <br />16 <br />2005.0100 <br />East 14th St. South Area Medians - 145th Ave. to Southern City Limit <br />$ <br />3,500,000 <br />17 <br />2016.0220 <br />Main Library - Furniture Replacement <br />$ <br />66,000 <br />18 <br />2014.0430 <br />Bicycle Network West <br />$ <br />250,000 <br />19 <br />2014.0390 <br />Marina Park — Play Areas (North and South) <br />$ <br />910,000 <br />20 <br />2016.0460 <br />Downtown Parking Strategy Implementation <br />$ <br />200,000 <br />21 <br />22 <br />23 <br />20xx.028 <br />2016.0540 <br />2006.0080 <br />Annual Repair of Walkways on City Property <br />Storm Water Trash Capture Phase 1 <br />Doolittle Drive Landscape Improvements Phase III - Davis to Fairway <br />$ <br />$ <br />50,000 <br />317,000 <br />25 <br />2016.0390 <br />Stenzel Well and Irrigation System <br />26 <br />2016.0441 <br />Install Pedestrian Lighting in the West Industrial Area <br />27 <br />2016.0450 <br />Hays St Creek Trail- East 14th to Davis <br />$ <br />2,000,000 <br />28 <br />2004.0211 <br />EOC Back-up Communications and Information Technology Facility <br />$ <br />55,100 <br />29 <br />2006.0060 <br />Eden Road Construction <br />30 <br />31 <br />2009.0030 <br />2014.0370 <br />Lake Chabot Road Slope Stabilization Design <br />Main Library - Recarpeting <br />$ <br />$ <br />285,000 <br />542,000 <br />